BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2025 at 8:00 PM

Updated May 28, 2025

Renovation of an educational facility in Horsham, Pennsylvania. Completed plans call for the renovation of a educational facility.

The Hatboro-Horsham School District has the right to accept any bid, to reject all bids and to waive any informalities if it is in the best interest of the public to do so. Bill Stone Director of Business Affairs Erect and maintain any scaffold structures necessary to work the Project. 4. Remove the existing lightning arrester system. 5. 6. Remove all shingles, underlayments and built-in metal flashings. 7. 8 Remove all existing ridge air vents. 9. Remove the existing roof-to-wall air vent on Roof'S8'. 10. 11. Allowances: a. 12. The intent ofthis Section ofthe Specifications is to provide a general outline ofthe work required to complete the installation ofstanding seam metal roofs and roofrelated sheet metal work on the Hallowell Elementary School for the Hatboro Horsham School District. Remove all existing gutters and gutter straps. The existing downspouts are to remain and be protected from damage throughout the duration ofthe Project. Cut and remove the wall flange on all other roof-to-wall air vents as shown/noted on the Contract Drawings. Allowance No. 1 : The contractor shall include in their bid the cost to drill-out pop rivets/back-out fasteners as required to remove and resecure two hundred (200) linear feet of loose/disengages fascia panels at various locations on the roofs. Provide and install temporary protection over the surfaces of all low slope EPDM membrane roofs. The temporary protection shall consist ofplywood sheathing laid over insulation boards as specified. Broom the surface of all roof decks and EPDM membrane covered crickets to remove all dirt, dust, and debris. Secure any raised fasteners flush to the surface ofthe roof deck. Hose test all existing downspouts and below grade roofdrain lines prior to the start and upon the completion of all work. Remove all existing: water diverters; fascia/metal edge flashings; rake flashings; two-piece counter flashing inserts; expansion joint cover; and pipe flashings. The existing fascia covers are to remain. 010100: Summary ofWork Roof Replacement Project Hatboro Horsham School District Hallowell Elementary School 501 West Moreland Avenue Horsham, PA Any questions concerning the interpretation of the Drawings, Specifications or other Contract ROOF SYSTEMS CONSULTING COMPANY Gwynedd Office Park 768 N. Bethlehem Pike, Suite 103 Lower Gwynedd, PA 19002 215-646-0149 fmellor@rscl981.com Documents should be directed to: Bid Results :: Base Bid 1 :: Pro Com Roofing Corp. :: $1,829,669.00 Base Bid 2 :: Metal Alliance, Inc. :: $1,106,500.00 Base Bid 3 :: Metal Alliance, Inc. :: $811,630.00

Award

Educational

$3,747,799.00

Public - County

Renovation

6

9

4

4

Subscribe For Documents

18 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
1,129
Active Projects
504
Bidding Soon
6,280
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

June 16, 2025

Project location map

501 W Moreland Ave, Horsham, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.