BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 7, 2025 at 8:00 PM

Updated May 8, 2025

Site work for a power facility in Fresno, California. Completed plans call for site work for a power facility.

Reference Number 0000381118 Kings River Conservation District (KRCD) is requesting for bids for the purchase and installation of Condition Monitoring Equipment for all three generating units at Jeff L.Taylor Hydroelectric Power Plant. A full technical description is included with the notice. Question Deadline 04/21/2025 at 3:00 PM PT Questions are submitted online No The following shall be provided as the minimum base scope for each generating unit2.1. One (1) Magnetic Flux probe 2.2. Four (4) Air Gap sensors on the generator stator top 2.3. Four (4) Air Gap sensors on the generator stator bottom (if deemed necessary) 2.4. Two (2) Generator Guide Bearing Radial Shaft probes for Upper Guide Bearing 2.5. Two (2) Generator Guide Bearing Radial Shaft probes for Lower Guide Bearing 2.6. Two (2) Turbine Guide Bearing Radial Shaft probes for Turbine Guide Bearing 2.7. One (1) Stator Core Absolute Vibration Accelerometer 2.8. One (1) Stator Frame Absolute Vibration Accelerometer 2.9. One (1) Turbine Head Cover Absolute Vibration Accelerometer 2.10. Signal Conditioners required for all the above signals, mounted in a NEMA-4X rated enclosure 2.11. One (1) Sync Probe 2.12. Processing Unit and processing modules for all the above signals- each generating unit shall have its dedicated cabinet mounted in one (1) NEMA-12 enclosure with proper cutouts, swing doors, heating, cooling and air circulation units as required, communication modules and other appurtenances as required. 2.13. One (1) Desktop Computer to serve as the Serve and Data Acquisition Unit 2.14. Appropriate software including licenses for continuous unit condition monitoring and data acquisition 2.15. All required cables and cable hardware including communication cable (EtherNet, Fibre, etc.) 2.16. Site Commissioning and supervision support 2.17. Training (collective- one time)- at the commissioning of first unit. 2.18. Optional Items: Any additional measurement techniques that may benefit the owner and that can be tied to the same condition monitoring system. Provide itemized cost and detailed description of the optional materials.

Post-Bid

Power Plant

$600,000.00

Public - City

Site Work

3

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
13
Bidding Soon
686
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

June 4, 2025

Project location map

Multiple Locations, Fresno, CA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.