Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 7, 2025 at 8:00 PM
Updated May 8, 2025
Site work for a power facility in Fresno, California. Completed plans call for site work for a power facility.
Reference Number 0000381118 Kings River Conservation District (KRCD) is requesting for bids for the purchase and installation of Condition Monitoring Equipment for all three generating units at Jeff L.Taylor Hydroelectric Power Plant. A full technical description is included with the notice. Question Deadline 04/21/2025 at 3:00 PM PT Questions are submitted online No The following shall be provided as the minimum base scope for each generating unit2.1. One (1) Magnetic Flux probe 2.2. Four (4) Air Gap sensors on the generator stator top 2.3. Four (4) Air Gap sensors on the generator stator bottom (if deemed necessary) 2.4. Two (2) Generator Guide Bearing Radial Shaft probes for Upper Guide Bearing 2.5. Two (2) Generator Guide Bearing Radial Shaft probes for Lower Guide Bearing 2.6. Two (2) Turbine Guide Bearing Radial Shaft probes for Turbine Guide Bearing 2.7. One (1) Stator Core Absolute Vibration Accelerometer 2.8. One (1) Stator Frame Absolute Vibration Accelerometer 2.9. One (1) Turbine Head Cover Absolute Vibration Accelerometer 2.10. Signal Conditioners required for all the above signals, mounted in a NEMA-4X rated enclosure 2.11. One (1) Sync Probe 2.12. Processing Unit and processing modules for all the above signals- each generating unit shall have its dedicated cabinet mounted in one (1) NEMA-12 enclosure with proper cutouts, swing doors, heating, cooling and air circulation units as required, communication modules and other appurtenances as required. 2.13. One (1) Desktop Computer to serve as the Serve and Data Acquisition Unit 2.14. Appropriate software including licenses for continuous unit condition monitoring and data acquisition 2.15. All required cables and cable hardware including communication cable (EtherNet, Fibre, etc.) 2.16. Site Commissioning and supervision support 2.17. Training (collective- one time)- at the commissioning of first unit. 2.18. Optional Items: Any additional measurement techniques that may benefit the owner and that can be tied to the same condition monitoring system. Provide itemized cost and detailed description of the optional materials.
Post-Bid
Power Plant
$600,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2025
June 4, 2025
Multiple Locations, Fresno, CA
Related To This Project
Fresno, CA
Bid Date: Apr 16 2025
Fresno, CA
Bid Date: May 06 2025
Fresno, CA
Bid Date: Apr 15 2025
Fresno, CA
Bid Date: May 15 2025
Fresno, CA
Bid Date: May 08 2025
Fresno, CA
Bid Date: Apr 29 2025
Fresno, CA
Bid Date: May 06 2025
Fresno, CA
Bid Date: May 06 2025
Fresno, CA
Bid Date: Oct 21 2025
Fresno, CA
Bid Date: May 01 2025
Fresno, CA
Bid Date: Apr 29 2025
Fresno, CA
Bid Date: Apr 30 2025
Fresno, CA
Bid Date: Apr 15 2025
Fresno, CA
Bid Date: Sep 01 2020
Fresno, CA
Bid Date: May 01 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
