BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 19, 2025 at 8:00 PM

Updated October 23, 2025

Site work and new construction of a mixed-use development in Elkville, Illinois. Design plans call for the construction of a 48,000-square-foot educational facility; and for site work for a educational facility.

The Elverado Community Unit School District 196 is pursuing the construction of a new Pre-K through 8th grade school to replace three aging facilities: Elkville Primary (1949), Vergennes Elementary/Elverado Intermediate (1959), and the Junior High (1940, originally a WPA project). The existing buildings show significant wear, including structural cracks and outdated infrastructure, reflecting over 20 years of deferred state funding. In April 2025, voters approved a referendum allowing the district to issue $11 million in bonds to fund the new school. The facility will be built adjacent to the current high school, consolidating all district operations onto a single campus while maintaining age-appropriate separation between student groups. The proposed design includes: Separate classroom wings for different age groups A dedicated gymnasium and commons area A layout that avoids mixing younger students with older ones A drive and parking area separating the new school from the high school The project aims to streamline operations, reduce long-term costs, and modernize learning environments. However, post-referendum assessments revealed that the $11 million budget may be insufficient, prompting the district to reassess funding strategies and project scope. As of September 19, 2025, planning and funding reassessment phase. Construction timeline pending revised cost estimates and potential additional funding sources.

Design

Educational

$21,000,000.00

Public - City

New Construction, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
176
Active Projects
88
Bidding Soon
1,266
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

September 30, 2026

Project location map

To Be Determined, Elkville, IL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.