BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2025 at 8:00 PM

Updated May 14, 2025

Renovation of a water / sewer project in Cookson, Oklahoma. Completed plans call for the renovation of a wastewater treatment plant.

Quantity Unit Description 1 L.S. Follow unloading instructions for the unloading of the CMF unit from shipping container (will require coordination with shipping company and having handling equipment with minimum 10,000-lb lifting capacity at water treatment plant (WTP) to unload CMF unit once it arrives) and placement inside WTP. Unloading of Electrical & Pneumatic Control Panels and other loose shipped items. Installation of four concrete equipment pads inside WTP for CMF unit (must be installed before unit arrives, anticipated arrival of unit is end of May). Installation of support leg extensions onto equipment pads. Installation of CMF unit onto leg extensions. Installation of block (4) & bleed valves (4) to CMF unit (will require field electrical wiring and pneumatic tubing to be supplied and installed). Installation of Unit Process & B/Wash Feed (AV3), Unit CIP Inlet/Drain (AV9), Unit Manifold Filtrate Exhaust (AV15), Unit TURB Sample Isolation (MV3), and Unit Filtrate Turbidimeter Sample (SV1) loose shipped valves. Installation of Turbidimeter panel. Installation of Unit Electrical and Pneumatic Control Panels on CMF unit with external field wiring (landing of wires and pneumatic tubing inside each control panel will be done by Memcor representative). 1 L.S. Piping and Appurtenances. All interconnect piping/expansion joints, flange hardware, tubing, fittings and installation required to connect new CMF unit to raw water feed and filtered water piping, existing ancillary equipment (Backwash Tank, Process Air Receiver, To/From CIP System, To CIP System) Piping materials and service lines must conform with table on Sheet 4 of the Memcor P&IDs. 1 L.S. Electrical and Controls. Upgrade WTP master control panel PLC, I/O modules, power supply and communication card to match/provide compatibility with PLC in new CMF unit. Upgrade existing CMF unit PLC, I/O modules, power supply and communication card to match/provide compatibility to upgraded master control panel and new CMF unit. Install/Supply Ethernet wiring between existing Page 2 master control panel and new CMF unit control panel. Provide field wiring and air supply (as required) for Block & Bleed Valves, and all loose shipped vales as required by Memcor Installation Instructions/P&ID Sheets (included in Specifications). Provide external field wiring for power and air supply hook up for new CMF unit. 1 L.S. Upgrade and configure SCADA system for compatibility with new CMF unit and upgraded PLC for master control panel and existing CMF unit. Upgrade and configure new control software.

Award

Water / Sewer

$523,610.00

Public - County

Renovation

111

52

11

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
171
Active Projects
103
Bidding Soon
1,237
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

May 19, 2025

Project location map

Multiple Locations, Cookson, OK

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.