Published April 22, 2025 at 8:00 PM

Updated April 23, 2025

Site work and paving for a mixed-use development in Tripoli, Iowa. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The extent of the work consists of four blocks of sanitary sewer main replacement on First and Second Streets NE, three blocks of water main replacement on First and Second Streets N, 3 blocks of new asphalt surfaced street on First and Second Streets NE, milling and new asphalt mat on Railroad Avenue, subdrain tile, storm sewer intakes, ADA ramps and associated work in the City of Tripoli, Iowa. Contractor shall fully complete by October 3, 2025. Liquidated Damages in the amount of $1,000.00 per Calendar Day will be assessed for each Calendar Day that any work shall remain uncompleted beyond the specified completion date allowed. Est. Value Notes: Div 1: $393,461; Div 2: $276,335; Div. 3: $243,737; Div 4: $41,259 Each bidder shall accompany its bid with bid security as security that the successful bidder will enter into a contract for the work bid upon and will furnish after the award of contract a corporate surety bond, in form acceptable to the Jurisdiction, for the faithful performance of the contract, in an amount equal to one hundred percent of the amount of the contract. The bidder's security shall be in the amount of 5% of the total bid amount including all add alternates and shall be the Jurisdiction's bidder's bond with corporate surety satisfactory to the Jurisdiction. No other type of bid security will be accepted. The bidder's bond shall contain no condition except as provided in the specifications. The successful bidder will be required to furnish a construction performance, payment, and maintenance bond in an amount equal to one hundred percent (100%) of the contract price. Said bonds to be issued by a responsible surety approved by the City Council and shall guarantee the faithful performance of the contract and the terms and conditions therein contained and the maintenance of said improvements in good repair from the time of acceptance of the improvements by the City for not less than two (2) years. Contractor shall fully complete by October 3, 2025. Liquidated Damages in the amount of $1,000.00 per Calendar Day will be assessed for each Calendar Day that any work shall remain uncompleted beyond the specified completion date allowed. The City of Tripoli reserves the right to reject any and all bids.

Award

Roads / Highways

$954,792.00

Public - City

Paving, Site Work

53

5

2

6

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
119
Active Projects
84
Bidding Soon
977
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 17, 2025

May 21, 2025

Project location map

Multiple Locations, Tripoli, IA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.