BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published September 4, 2025 at 8:00 PM

Updated September 5, 2025

Site work for a civil project in Smoky Lake, Alberta. Completed plans call for site work for a bridge / tunnel; road / highway; and water / sewer project.

Township Road 590: BF 08200, SE SEC 2 TWP 59 RGE 13 W4M, Tributary to Stony Creek The existing bridge was constructed in 1967 and consists of a three span, 25.5 m long (8.5 8.5 8.5 m), type HC concrete girder bridge on a standard treated timber substructure. The existing structure is installed square to the roadway and carries Township Road 590 over Stony Creek. The scope of work for this project includes, but is not limited to, the following: - Mobilization and Demobilization - Pre-disturbance Wildlife Sweep - Traffic Accommodation for Bridge Construction (Local Road Detour) - Clearing, Topsoil Stripping and Stockpiling - Demolition and Disposal of Existing Bridge Structure - Salvage of Existing Precast Girders PROVISIONAL - Excavation Structural/ Channel - Supply and Installation of Driven Steel Piles - Supply and Installation of Structural Steel (Pile Caps, Backwall, etc.) - Granular Backfill - Supply and Installation of Non-Woven Geotextiles - Supply and Installation of Heavy Rock Riprap (Class 1) - Supply and Installation of Precast Concrete Units (SL-510, 10 m long) - Supply and Installation of Bridge Plaques and Hazard Markers - Roadway Work Topsoil stripping to stockpile Obliteration of existing channelized right turn lane and Range Road 132 intersection and approach Construction of new intersection and Range Road 132 approach Grade widening on Township Road 590 to accommodate guardrail installation Gravel surfacing Topsoil placement Seeding - Installation of 600 mm dia. CSP culvert at new intersection - Bridgerail, including Transitions - Guardrail, including End Terminals - Permanent signage and guide post/delineator work - Supply and Installation of Erosion Control Soil Coverings (Type B) - Supply and Installation of Straw Rolls Erosion Control Barrier - Turbidity Monitoring, if required - Fish Capture, Salvage and Release, if required - Site Clean-up and Restoration *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Bridges / Tunnels

$1,949,140.00

Public - County

Site Work

31

7

5

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
22
Bidding Soon
447
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 27, 2025

July 21, 2025

Project location map

SE SEC 2 TWP 59 RGE 13 W4M, Smoky Lake, AB

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.