BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 15, 2025 at 8:00 PM

Updated May 16, 2025

Site work for a municipal facility in Salem, Oregon. Completed plans call for site work for a municipal facility.

Oregon State Buildings Clean and Seal Construction Project This Solicitation is for a Public Improvement Project Subject to Ors 279c.800 Through 279c.870. Sole Point of Contact (Spc) for This Solicitation is Tamisha Zakrzewski, Procurement Contract Specialist, at Tamisha.zakrzewski@das.oregon.gov or by Phone at (971) 718-2502. The scope of work is asfollows: Cleaning and Sealing the Exterior of the following State of Oregon Buildings . 1. The Archives Building; 800 Summer St., NE Salem Oregon 97301 2. The Employment Building; 875 Union St., Salem Oregon 97301 3. The Human Services Building (HSB); 500 Summer St., NE Salem Oregon 97301. 4. The Library Building: 250 Winter St., NE Salem Oregon 97301 5. The Public Services Building (PSB); 255 Capitol St., NE Salem Oregon 97301 A. Interior Storage 1. Store with seals and labels intact and legible and in weathertight enclosure when subject to damage by the elements. 2. Maintain required temperature and humidity rangesin Contractor provided enclosures. Suitability of Owner furnished storage shall be judged and used by Contractor to meet manufacturer's requirements. B. Contractor Staging Areas : Store materials above the ground on blocking or skids to prevent soiling, staining, and/or moisture infiltration. Cover materials with waterproof breathable sheet coverings, such as canvas tarps, when they are subject to deterioration by the elements; provide adequate ventilation to avoid condensation. Materials allowed to become damp or wet shall not be used in the project and shall be rejected. All storage locations are to be approved in advance by Owner's Authorized Representative. C. Arrange storage in a manner to provide easy access for inspections of stored products to assure that products are maintained underspecified conditions and free from damage or deterioration. D. Provide substantial coverings as necessary to protect installed products from damage from traffic and subsequent construction operations. Remove when no longer needed. F. The Contractor is responsible for designating the delivery dates of Owner-furnished if applicable in the Contractor's Construction Schedule and for receiving, unloading and handling Owner- furnished items at the site. The Contractor is responsible for protecting Owner-furnished items from damage, including damage from exposure to the elements, and to repair or replace items damaged as a result of their operations. Question Deadline 04/17/2025 at 2:00 PM PT The following range is a Project estimate for bonding purposes: $1,250,000.00. SUBSTANTIAL COMPLETION: October 01, 2025 FINAL COMPLETION: October 15, 2025

Award

Municipal

$333,656.00

Public - State/Provincial

Site Work

80

13

5

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
124
Active Projects
43
Bidding Soon
1,045
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 6, 2025

July 7, 2025

Project location map

Multiple Locations, Salem, OR


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.