Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 20, 2025 at 8:00 PM
Updated June 21, 2025
Site work for a water / sewer project in Tucson, Arizona. Completed plans call for site work for a water / sewer project.
Granular Activated Carbon Media Replacement Any questions regarding the RFQ or Specifications should be directed to Cameron Meyer: cmeyer@metrowater.com or (520) 209-2835 Bids Are for the Following Project: Granular Activated Carbon Media Bids Are Being Requested for the Periodic Replacement of Spent Granular Activated Carbon Media With New Granular Activated Carbon Media for Water Treatment Bids Shall Be Valid From July 1, 2025 Thru June 30, 2026 GAC Media Descriptions: A. Virgin Coconut Shell GAC Specifications: Provide virgin coconut shell granular activated carbon approved for drinking water treatment, including ANSI/NSF Standard 61 certification. The activated carbon shall conform to the following specifications: Iodine Number, mg/g 1,050 (min) Moisture by Weight 5% (max) Effective Size 0.60 - 0.85 mm Uniformity Coefficient 2.0 Hardness Number 97 Abrasion Number 85 Screen Size by Weight, US Sieve Series On 12 mesh 10% (max) Through 30 mesh 5% (max) Apparent Density (tamped) 0.47 - 0.52 g/cc Total Ash 5% (max) B. Virgin Bituminous Coal GAC Specifications: Provide virgin reagglomerated bituminous coal granular activated carbon (Calgon Carbon Filtrasorb 400M or approved equal) approved for drinking water treatment, including ANSI/NSF Standard 61 certification. The activated carbon shall conform to the following specifications: Iodine Number, mg/g 1,000 (min) Moisture by Weight 2% (max) Effective Size 0.55 - 0.75 mm Uniformity Coefficient 1.9 (max) Abrasion Number 75 (min) Trace Capacity Number mg/cc - 10 (min) Screen Size by Weight, US Sieve Series On 12 mesh 5% (max) Through 40 mesh 4% (max) Apparent Density (tamped) 0.57 g/cc Water Extracables < 1% Non-Wettable < 1% C. The delivered activated carbon must be accompanied by an analysis sheet certifying compliance with these specifications.
Post-Bid
Water / Sewer
$400,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2025
July 1, 2025
To Be Determined, Tucson, AZ
Related To This Project
Tucson, AZ
Bid Date: Apr 16 2025
Tucson, AZ
Bid Date: May 20 2025
Tucson, AZ
Bid Date: Apr 03 2025
Tucson, AZ
Bid Date: May 02 2025
Tucson, AZ
Bid Date: Apr 25 2025
Tucson, AZ
Bid Date: Aug 07 2025
Tucson, AZ
Bid Date: May 23 2025
Tucson, AZ
Bid Date: May 07 2025
Tucson, AZ
Bid Date: Apr 15 2025
Tucson, AZ
Bid Date: Apr 22 2025
Tucson, AZ
Bid Date: Apr 23 2025
Tucson, AZ
--
Tucson, AZ
Bid Date: Apr 30 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
