Published April 25, 2025 at 8:00 PM
Updated November 15, 2025
Site work for a transportation facility in Boston, Massachusetts. Completed plans call for site work for a transportation facility.
L1351-C1 FAA ASR SITE 9 ELECTRICAL EQUIPMENT REPLACEMENT LOCATION, LOGAN INTERNATIONAL AIRPORT, BOSTON, MASSACHUSETTS The work includes demolition and replacement of electrical equipment at asr site 9, equipment includes an automatic transfer switch and a distribution switchboard. The estimated contract cost is ($890,000.00). Minority/Women Owned Business Enterprise participation provision requiring that not less than TWO POINT NINE PERCENT (2.9% phased construction activities shall begin on or about March, 2026 t is the intent that the Contract Documents shall prescribe a complete Work or improvement. The Contractor shall remove all obstructions from within the lines of the improvement; and shall do such additional, extra, and incidental Work as may be considered necessary to complete the Work in a substantial and acceptable manner; and when it is so completed, s/he shall leave the Work in a neat and finished condition. The Contractor shall do all the Work and furnish all the materials, equipment, tools, and appliances, except as otherwise specified, necessary or proper for performing and completing the Work required by the Contract, in the manner and within the time specified. S/He shall complete the entire Work to the satisfaction of the Engineer, and in accordance with the Contract Documents. All Work to be done and furnished under the Contract shall be done and furnished strictly pursuant to, and in conformity with the Contract Documents, and also in accordance with the directions of the Engineer as given from time to time during the progress of the Work pursuant to the terms of the Contract. The Notice to Contractors and the Proposal submitted by the Contractor shall also form part of the Contract. The Contract shall include grading, where indicated outside the location of the Work, and other miscellaneous Work as shown on the Plans and as directed. Copies of all A.S.T.M., F.A.A. and A.A.S.H.T.O. Specifications will be available for reference at the Capital Programs Department Office of the Authority.
Bid Results
Transportation Terminals
$458,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2025
March 2, 2026
To Be Determined, Boston, MA
Related To This Project
Boston, MA
Bid Date: Apr 16 2025
Boston, MA
Bid Date: Apr 03 2025
Boston, MA
Bid Date: Apr 29 2025
Boston, MA
Bid Date: Apr 16 2025
Boston, MA
Bid Date: Apr 24 2025
Boston, MA
Bid Date: Apr 16 2025
Boston, MA
--
Boston, MA
Bid Date: Apr 16 2025
Boston, MA
Bid Date: Apr 16 2025
Boston, MA
--
Boston, MA
Bid Date: Apr 14 2025
Boston, MA
Bid Date: Mar 31 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.