BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 21, 2025 at 8:00 PM

Updated April 22, 2025

Site work and new construction of a fire / police facility in Lake Forest, Illinois. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

The purpose of this RFP is to select a professional construction management firm to provide the City with construction management services for the City's New Police Station Project. The City is seeking a professional firm to fulfill a comprehensive Construction Manager role. Currently, the City is engaged with a professional design firm, Cordogan Clark, to complete project design. Services related to the professional Construction Manager for the New Police Station Project will include, but are not limited to, assisting the City and its contracted design firm to finalize the project construction schedule and phasing, oversee and manage the public bid process and the various bid packages in accordance with the City's Purchasing Policy, vet the lowest responsive and responsible bidders, provide bid & budget analysis, make recommendations for bid award, issue contracts for construction to the awarded firms with the construction management firm (held by the Construction Management firm/at risk) with a summarized guaranteed maximum price for the City, manage all construction onsite activities which will include the dedication of a fulltime onsite Project Superintendent, and complete all project close-out. Additionally, the selected firm will be expected to collaborate with Cordogan Clark and City staff which may include, but is not limited to, the Police, Public Works, and Community Development Departments. Questions concerning the RFP and elements discussed herein, may be directed to Jim Lockefeer, Assistant to the Director of Public Works via email at 26TULockefej@cityoflakeforest.comU26T. Document info : The RFP package will contain a detailed scope of services, additional background information, and other supplemental attachments (cost estimates, anticipated construction schedule, etc.) The RFP Committee will seek to interview select candidate firms based on the evaluation criteria identified herein. In-person interviews are anticipated to occur on April 24 and April 25, 2025

Post-Bid

Fire / Police

$350,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
522
Active Projects
292
Bidding Soon
3,707
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2025

July 21, 2025

Project location map

800 N Field Dr, Lake Forest, IL


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.