BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 15, 2025 at 8:00 PM

Updated May 16, 2025

Site work and renovation of a water / sewer project in Factoryville, Pennsylvania. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Lake Winola Wastewater Treatment Plant Facility Upgrade Contracts Nos. 23 and 24 consists of reconditioning two existing wastewater treatment lagoons, including new liners, and new underdrains; the replacement of the above water aeration pipe and the reuse of the below water tubing; construction of a new SAGR system, submersible pump station, several small tanks and chambers, construction of a new Soda Ash/Blower Building; construction of two underground process tanks and construction of a Filter/UV Building. The project will include retaining walls, cut and fill earth moving, pipes and valves, along with related equipment. The last day for questions regarding the project or to make a site visit is April 19, 2025. Change the last day for questions from April 19, 2025 to May 5, 2025 A Bid Bond drawn to the order of the Lake Winola in the amount equal to ten percent (10%) of the amount of the bid must be submitted with the proposal as bid security This project was financed in part by a grant from the Commonwealth of Pennsylvania, Commonwealth Financing Authority - COVID-19 ARPA H2O PA and financed in part by a grant/loan under the administration of the Commonwealth of Pennsylvania -Pennsylvania Infrastructure Investment Authority - This project is requiring all contractors to demonstrate compliance with federal Executive Order 11625, 12138, and 12432 and EPA Regulations at CFR Part 33, through the detailed documentation of solicitation of Disadvantage Business Enterprises (DBEs). Contractors must demonstrate the Six Good Faith Efforts to identify and solicit DBE firms that are potential sources for any procurement action in the areas of project construction, equipment, services, and supplies by including state qualified small businesses, and minority and women owned business enterprises in the bidding process. PA Wage rates, PA Steel Act, DBE searches, Equal Opportunity Clause (41 CFR 60-1.4(b), and Nondiscrimination/Sexual Harassment requirements also apply to this project. A contract will not be awarded to any firm that is suspended or debarred by the Commonwealth of Pennsylvania or the federal government. Bid Result: CONTRACT 23 - STRUCTURAL/MECHANICAL : The Milnes Co., Inc. - $5,808,008.00 CONTRACT 24 - ELECTRICAL WORK : Everon Electrical Contractors, Inc - $698,980.00

Bid Results

Water / Sewer

$6,506,988.00

Public - City

Renovation, Site Work

129

28

80

5

Subscribe For Documents

38 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
284
Active Projects
132
Bidding Soon
1,621
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 14, 2025

June 13, 2025

Project location map

135 Hug Ln, Factoryville, PA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.