Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 19, 2025 at 8:00 PM
Updated May 20, 2025
Renovation of an educational facility in Nogales, Arizona. Completed plans call for the renovation of a educational facility.
Nogales Unified School District, #1 is in Santa Cruz County serving our K-12 Community. This Project:HVAC Project at Wade Carpenter Middle School, will be funded by district bond money or the Division of School Facilities. This is one of four prebids in Nogales. This project has structural, electrical, and lots of HVAC work to be done. Construction time may be up to 7 months. Please read the asbestos report. Question Deadline 05/01/2025 at 12:00 PM MT Bring all your major subcontractors with you to this prebid. This will be the only opportunity to visit the site as it is an occupied campus. Bid Bond: An irrevocable bid security payable to Nogales Unified School District, #1 in the amount of 10.00% of the total bid project cost is required. This security should be in the form of a bid bond, certified check, and must be scanned into the Vendor Questionnaire the District by the due time and date cited for this solicitation. The original must be in the District's possession within 48 hours of the opening of the bids. Performance Bond: The contractor shall be required to furnish an irrevocable security in the amount of 100.00% of the total contract price payable to Nogales Unified School District, #1, binding the contractor to provide faithful performance of the contract. This security must be in the possession of the District within 48 hours after receipt of purchase order or other notice of award. The cost of this bond is itemized on the bid submittal form. NUSD reserves the right to reject proposed subcontractors. All subcontractors must be approved by the school district prior to start of work. The District reserves the right to decline conference call attendance or participation.. this scope involves hvac upgrade and replacement. work at the following buildings on the wade carpenter middle school campus: buildings #1006 & #1010. remove existing mechanical units, devices, and accessories, including electrical wiring and connections, architectural elements, surfaces and finishes, where and as indicated on these contract documents prepared by the architects and engineers. properly recycle/ dispose of all materials. install new structural framing below the roof decks to support new mechanical equipment loads. provide and install new mechanical, plumbing, and electrical equipment and fixtures in both buildings as indicated. patch architectural interior surfaces and finishes disturbed by the work, provide new ceiling systems as shown. inspect and repair roof decks as necessary where damage is encountered. patch existing roof membranes in areas disturbed by the mechanical or structural work, especially at new roof curbs and where existing equipment was removed. verify that roof curbs comply with roof system warranty requirements provide and install complete new water tight modified bitumen roof system including cover board, rigid insulation, walk pads and acrylic coating at the roof over the kitchen in building # 1006. appropriate trades person to modify, remove and reinstall, or extend any mechanical, electrical, plumbing (including gas), cctv, telephone, antennae, sound, or lighting facilities, etc. found to obstruct the work of this project. the project will take place during the school year while the campus is occupied. PID-124041 Project No. AZ1244.27
Bid Results
Educational
$2,458,000.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2025
June 16, 2025
595 W Kino St, Nogales, AZ
Related To This Project
Nogales, AZ
Bid Date: Jun 11 2025
Nogales, AZ
Bid Date: May 12 2025
Nogales, AZ
Bid Date: Jul 11 2025
Nogales, AZ
Bid Date: Jun 12 2025
Nogales, AZ
Bid Date: Nov 07 2025
Nogales, AZ
Bid Date: Aug 12 2025
Nogales, AZ
Bid Date: Nov 07 2025
Nogales, AZ
Bid Date: May 13 2025
Nogales, AZ
Bid Date: Apr 30 2025
Nogales, AZ
Bid Date: May 01 2025
Nogales, AZ
Bid Date: May 02 2025
Nogales, AZ
Bid Date: Feb 21 2025
Nogales, AZ
Bid Date: Oct 21 2024
Nogales, AZ
Bid Date: Nov 01 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
