BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 11, 2025 at 8:00 PM

Updated June 13, 2025

Site work for a civil project in Brick, New Jersey. Completed plans call for site work for a water / sewer project.

The replacement of old water main valves needed for day-to-day water treatment plant operations. The valves to be replaced consist of (1) 24 butterfly valve, (1) 20 butterfly valve, (2) 12 gate valves. One 12 gate valve will be replaced with a 12 butterfly valve. The work also consists of the installation of (1) 12 insertion valve. Base paving will be required for all valve locations, final paving will be required for the work on Forge Pond Road. The replacement of (1) 12 Gate Valve and the installation of the 12 Insertion Valve will take place on Forge Pond Road. Note: This project is not funded by the New Jersey Environmental Infrastructure Financing Program (NJEIFP). Each prospective bidder will have to provide the appropriate installation references and certifications to the satisfaction of the Owner. Each bid must be accompanied by a Bid Bond or Certified Check for an amount equal to ten percent (10%) of the bid or a maximum of $20,000.00; such certification to be without condition or qualification, and the check made payable to The Brick Township Municipal Utilities Authority. Brick Utilities reserves the right to waive any minor informalities or non-material exceptions/defects in a bid. Brick Utilities reserves the right to reject any bid containing a material defect(s) and further reserves the right to reject all bids under any circumstances set forth Should you have any questions concerning this contract, please contact the Engineering Department at (732) 458 7000. Work The replacement ofold water main valves needed for day-to-day water treatment plant operations. The valves to be replaced consist of(1) 24" Butterfly Valve, (1) 20" Butterfly Valve, (2) 12" Gate Valves. One 12" gate valve will be replaced with a 12" Butterfly Valve. The work also consists of the installation of(1) 12" Insertion valve. Base paving will be required for all valve locations, final paving will be required for the work on Forge Pond Road. Question Deadline 04/22/2025

Award

Water / Sewer

$229,626.00

Public - County

Site Work

6

16

7

3

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
876
Active Projects
412
Bidding Soon
6,812
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 29, 2025

May 29, 2025

Project location map

Forge Pond Rd, Brick, NJ

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.