Published May 22, 2025 at 8:00 PM

Updated May 23, 2025

Site work and paving for a sidewalk / parking lot in Lebanon, Missouri. Working plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

**As of May 22, 2025, no bid received. No definite date for the rebid.** 1) Production and delivery of ready-mix concrete to the Project Site. The concrete material is expected to be provided in multiple phases. This includes providing concrete mix designs, material submittals, and other related as required in Specification Section 033000 "Cast In Place Concrete" for Owner Approval. a) Use of "Exposed to Freeze/Thaw Concrete" for foundation walls, exterior slabs-on-grade, sidewalks, and other concrete onsite. Normal-weight concrete. b) Minimum Compressive Strength: 5000 psi at 28 days c) Maximum W/C Ratio: 0.45. d) Slump Limit: 4 inches for concrete with verified slump of 2 to 4 inches plus or minus 1 inch, before adding high-range water-reducing admixture or plasticizing admixture, 8 inches maximum after admixture addition. e) Air Content: 5.5 percent, plus or minus 1.5 percent at point of delivery for 1-1/12-inch nominal maximum aggregate size. 2) Materials Contract Total Estimated Quantity: 184 Cubic Yards a) The concrete materials will need to be provided in 9 separate phases. See the unit prices for each phase along with estimated quantity per phase. b) All yardages and number of pours are estimates only for unit pricing. c) Additional fees such as mobilization, demobilization, travel, small load, and all other associated fees shall be included in the Concrete Materials unit pricing. 3) The Owner shall provide a minimum of 14 days lead time to the Contractor for scheduling required services. a) This work requires the use of pumper truck to place the Concrete material. Pumping services are not included in this contract. The Owner will provide the coordination between the pumper truck and concrete materials provider. Question Deadline 04/22/2025 Every request for interpretation shall be made in writing and submitted with all supporting documents not less than seven (7) calendar days before opening of bids.

Final Planning

Sidewalks / Parking Lot

$300,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
85
Active Projects
37
Bidding Soon
434
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

November 24, 2025

Project location map

26702 State Hwy N, Lebanon, MO

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.