BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 25, 2025 at 8:00 PM

Updated April 26, 2025

Site work and paving for a sidewalk / parking lot in Spiritwood, Saskatchewan. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

Light of Christ Catholic School Division is seeking bids from qualified contractors for the removal and replacement of the cement sidewalk surrounding the school. The project includes the removal of the existing sidewalk, preparation of the site, installation of a new 6-inch thick, 4-foot-wide concrete sidewalk pinned to the foundation of the school, and removal of the flower beds at the front entrance with new color-matching parging applied where necessary. The total sidewalk length is approximately 140 linear meters, with an additional 51 square meters of concrete replacement at the front entrance. The selected contractor shall be responsible for the following: Demolition and Removal: Remove and properly dispose of the existing sidewalk. Remove and properly dispose of the existing flower beds at the front entrance. Prepare the foundation for new concrete installation. Concrete Sidewalk Installation: Install a new 6-inch thick, 4-foot-wide concrete sidewalk totaling 140 linear meters. Ensure the new sidewalk is properly pinned to the school's foundation. Ensure appropriate drainage and grading. Install six (6) roof drains beneath the sidewalk, each covered with a grate for easy cleaning. Broom finish for slip resistance Front Entrance Concrete Replacement: Install new concrete at the front entrance, covering an area of 51 square meters. Finishing Work: Apply color-matching brick or parging where the flower beds were removed. Ensure all work areas are cleaned and restored to a safe and presentable condition. Reseed all areas of grass disturbed by the project. The project is expected to begin on June 30, 2025 and be completed by Aug 8, 2025. Contractors must provide a proposed work schedule with their bid submission. Documents are available at www.sasktenders.ca

Post-Bid

Sidewalks / Parking Lot

$100,000.00

Public - State/Provincial

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
8
Active Projects
3
Bidding Soon
42
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

June 30, 2025

Project location map

216 2 St W, Spiritwood, SK

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.