BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 21, 2025 at 8:00 PM

Updated April 23, 2025

Site work and paving for a transportation facility in Bay Minette, Alabama. Completed plans call for site work for a transportation facility.

Major Items of Work Include Pavement Maintenance of Runway 8/26 and Taxiways at the Bay Minette Municipal Airport. Approximate Quantities Include: 1. Crack and Joint Repair 42,549 Lf 2. Rapid Cure Seal Coat (P-608r) 77,450 Sy 3. Markings 76,940 Sf the Project Shall Be Completed Within 90 Calendar Days of the Issuance of Notice to Proceed. Liquidated Damages for This Project Shall Be $500.00 Per Calendar Day. A Disadvantaged Business Enterprise (Dbe) Goal of 10.12% Has Been Established for This Project. The Contractor Must Purchase and Obtain the Plans and Specifications From the Website Listed Above or Obtain Them From Volkert in Order to Submit a Bid. Bids Must Be Submitted Upon the Forms Included Within the Contract Documents and Specifications. Bids Shall Include All Pages Included in Division I \d Bid Documents. Submission of the Entire Contract Book is Not Required. Guarantee Will Be Required With Each Bid as Follows: at Least 5% of the Amount of the Bid, but in No Event More Than Ten Thousand Dollars ($10,000), Shall Be Filed in the Form of a Certified Check or Bid Bond Payable to the Bay Minette Municipal Airport Authority. Contract Bond Will Be Required as Follows: 100% of the Contract Price. Labor and Materials Bond Will Be Required as Follows: 100% of the Contract Price. No Bids Will Be Considered Unless the Bidder, Whether Resident or Non-resident of Alabama, is Properly Qualified With the State of Alabama. In Addition, Non-residents of the State, if a Corporation, Shall Show Evidence of Having Qualified With the Secretary of State to Do Business in Alabama. No Contract Will Be Awarded Unless the Contractor Holds a Current and Appropriate License From the State Licensing Board for General Contractors, Montgomery, Alabama. No Bid Shall Be Withdrawn for a Period of 120 Days Subsequent to the Opening of Bids Without the Consent of the Owner. The Right is Reserved to Reject Any or All Bids and Waive Informalities in the Bidding. Mr. Malcolm "Mack" Byrd, Chairman Bay Minette Municipal Airport Authority Bay Minette, Alabama

Post-Bid

Transportation Terminals

$700,000.00

Public - City

Paving, Site Work

14

13

4

4

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
102
Active Projects
58
Bidding Soon
765
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

May 19, 2025

Project location map

11981 Airport Rd, Bay Minette, AL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.