BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 21, 2025 at 8:00 PM

Updated May 22, 2025

Demolition, site work, paving and renovation of a bridge / tunnel in Raymond, Minnesota. Completed plans call for site work for a bridge / tunnel; for the demolition of a bridge / tunnel; for the renovation of a bridge / tunnel; and for paving for a bridge / tunnel.

Bridge Replacement No. 34J57 located on 75th Ave SW, approximately 0.15 miles east of State Highway 23. Combined estimated quantities of work are: 12'x10' Precast Conc Box Culvert - 128 LIN FT, 12x 10 Precast Concrete Box Culvert End Sections - 4 EACH, Remove Existing Bridge - 1 LUMP SUM, Aggregate Surfacing Class 5 - 217 TON, Common Embankment (CV)(P) - 1514 CU YD, Granular Bedding 252 TON, Coarse Aggregate Bedding - 252 TON, Random Riprap Class 3 (Quarry-run) -130 CU YD, Turf Establishment and other miscellaneous construction items. A bid bond in the amount of five percent (5%) of the bid must be uploaded with all bids. Minimum wage rates to be paid by the contractor have been predetermined. Read carefully the wage scales contained in the Special Provisions, as they affect this project. Attention is called to the fact that the contractor must comply with the Special Equal Employment Opportunity Provisions, contained in the proposal. The County Board reserves the right to accept or reject any or all bids and to waive any defects or technicalities therein and to award the contract in the best interest of the County. Melvin W. Odens, P.E. Public Works Director

Award

Bridges / Tunnels

$381,514.00

Public - City

Demolition, Paving, Renovation, Site Work

11

7

5

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

June 12, 2025

Project location map

75th Ave SW, Raymond, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.