BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 6, 2025 at 8:00 PM

Updated May 7, 2025

Renovation of an educational facility in Fort Mill, South Carolina. Completed plans call for the renovation of a educational facility.

The Fort Mill School District is seeking sealed bids for the turn-key delivery/removal and installation of 14 windows at Orchard Park Elementary School to match existing windows. Please see Vendor Registry for detailed solicitation. Question Deadline 04/28/2025 at 10:00 AM ET Laurie Martinez, (803) 548-8430, martinezl@fortmillschools.org SCOPE OF WORK / SPECIFICATIONS Orchard Park Elementary School Windows Replacement The Fort Mill School District is seeking competitive sealed bids for the turn key delivery and installation of 14 windows to be replaced at Orchard Park Elementary School. Availability and estimated project completion date must be provided on the attached Bid Schedule. WINDOWS AND FRAMES: Contractor to supply all equipment and materials to remove, replace clean and prep openings for the install of 14 classroom windows. Room Numbers: (1) Principal office, (1) Assistant Principal office, (2) B105 classroom, (2) B108 classroom and (1) each of the following 8 classrooms. D100, D102, D104, D106, D108, D110, D112, and D114. All windows to match the existing windows. (Operation, appearance, etc.) We are requesting white Peerless casement/fixed windows with 1-inch grey tempered glass and integral blinds which match installed windows. Contractor is responsible for all measurement for proper fit and that all windows meet school safety standards. Remove all existing windows and prep existing openings for the installation of the new windows. Contractor will ensure that all windows are shimmed as required and anchored/screwed into place. Contractor to supply and install all interior/exterior window trim as required to match the existing windows on the building. Contractor will apply both interior/exterior caulking to ensure a complete seal around each window to prevent water, debris and pests from entering the building. Contractor is responsible for painting/touching up all interior/exterior areas surrounding the newly installed windows to ensure that all new windows, trim and surrounding areas match the rest of the building. Contractor must ensure that all windows, blinds, etc. operate with no discrepancies.

Award

Educational

$119,216.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
255
Active Projects
153
Bidding Soon
1,729
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2025

June 4, 2025

Project location map

474 Third Baxter St, Fort Mill, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.