Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 6, 2025 at 8:00 PM
Updated May 7, 2025
Renovation of an educational facility in Fort Mill, South Carolina. Completed plans call for the renovation of a educational facility.
The Fort Mill School District is seeking sealed bids for the turn-key delivery/removal and installation of 14 windows at Orchard Park Elementary School to match existing windows. Please see Vendor Registry for detailed solicitation. Question Deadline 04/28/2025 at 10:00 AM ET Laurie Martinez, (803) 548-8430, martinezl@fortmillschools.org SCOPE OF WORK / SPECIFICATIONS Orchard Park Elementary School Windows Replacement The Fort Mill School District is seeking competitive sealed bids for the turn key delivery and installation of 14 windows to be replaced at Orchard Park Elementary School. Availability and estimated project completion date must be provided on the attached Bid Schedule. WINDOWS AND FRAMES: Contractor to supply all equipment and materials to remove, replace clean and prep openings for the install of 14 classroom windows. Room Numbers: (1) Principal office, (1) Assistant Principal office, (2) B105 classroom, (2) B108 classroom and (1) each of the following 8 classrooms. D100, D102, D104, D106, D108, D110, D112, and D114. All windows to match the existing windows. (Operation, appearance, etc.) We are requesting white Peerless casement/fixed windows with 1-inch grey tempered glass and integral blinds which match installed windows. Contractor is responsible for all measurement for proper fit and that all windows meet school safety standards. Remove all existing windows and prep existing openings for the installation of the new windows. Contractor will ensure that all windows are shimmed as required and anchored/screwed into place. Contractor to supply and install all interior/exterior window trim as required to match the existing windows on the building. Contractor will apply both interior/exterior caulking to ensure a complete seal around each window to prevent water, debris and pests from entering the building. Contractor is responsible for painting/touching up all interior/exterior areas surrounding the newly installed windows to ensure that all new windows, trim and surrounding areas match the rest of the building. Contractor must ensure that all windows, blinds, etc. operate with no discrepancies.
Award
Educational
$119,216.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2025
June 4, 2025
474 Third Baxter St, Fort Mill, SC
Related To This Project
Fort Mill, SC
--
Fort Mill, SC
--
Fort Mill, SC
Bid Date: Aug 05 2025
Fort Mill, SC
Bid Date: May 07 2025
Fort Mill, SC
Bid Date: May 01 2025
Fort Mill, SC
Bid Date: May 07 2025
Fort Mill, SC
Bid Date: May 08 2025
Fort Mill, SC
Bid Date: Jul 05 2019
Fort Mill, SC
Bid Date: Apr 30 2025
Fort Mill, SC
--
Fort Mill, SC
Bid Date: Mar 27 2025
Fort Mill, SC
Bid Date: Apr 03 2025
Fort Mill, SC
Bid Date: Mar 11 2025
Fort Mill, SC
Bid Date: Mar 17 2025
Fort Mill, SC
Bid Date: Feb 28 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
