Site work for a water / sewer project in Fort Mill, South Carolina. Completed plans call for site work for a water / sewer project.
Supply all labor, equipment, materials, and incidentals necessary to apply an herbicide root control product within sanitary sewer lines in order to eliminate the root growth present and to control regrowth without damaging the vegetation producing the roots. Questions relevant to this RFP may be submitted by email to Matt Kennedy, Water and Sewer Maintenance Superintendent at Mkennedy@fortmillsc.gov no later than April 23, 2025 by 5:00 pm. *The list of planholders and/or interested bidders is not being tracked by the stakeholders involved with this project. If you are an interested contractor and wish to be listed as a bidder, please notify our editorial staff at addtobidlist@constructconnect.com. All CIPP lining placed shall be guaranteed by the Contractor and manufacturer for a period of one year from the date of final acceptance. During this period, defects discovered in the CIPP lining, as determined by the Engineer, shall be removed and replaced in a satisfactory manner by the Contractor at no cost to the Owner. The Owner may conduct an independent television inspection, at his own expense, of the lining work prior to the completion of the one-year guarantee period. A. Representative specimens of the installed liners are to be removed for testing by an independent laboratory. The number of specimens shall be atleast: 1. Liners less than 24 inches in diameter; one specimen for every 1,000 feet of liner installed 2. Liners from 24 inches to less than 48 inches; one specimen for every 750 feet installed 3. Liners 48 inches in diameter and greater; one specimen for every 500 feet installed B. Remove specimens of at least 18 inches in length for testing of thickness (as specified elsewhere herein) and for flexural properties per the following standards and procedures C. The cured liner shall have the following minimum structural properties: 1. Flexural Strength of 4,500 psi per ASTM D790 2. Flexural Modulus of 250,000 psi per ASTM D790 3. Tensile Strength of 3,000 psi per ASTM D638 The Contractor shall have successfully installed a minimum of 300,000 feet of CIPP over at least 5 years, using the methods and materials proposed forthis work, as documented by verifiable references. If steam cure is being proposed for the CIPP installation as specified herein, the Contractor must have successfully installed at least 200,000 feet of CIPP via steam cure over at least 5 years in wastewater collection systems utilizing the products specified herein. If the Contractor does not meet this experience requirement, then water cure shall be used for all installations.
Post-Bid
Water / Sewer
$600,000.00
Public - City
Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 7, 2025
June 6, 2025
Multiple Locations, Fort Mill, SC
Related To This Project
Fort Mill, SC
Bid Date: May 01 2025
Fort Mill, SC
Bid Date: May 07 2025
Fort Mill, SC
Bid Date: May 08 2025
Fort Mill, SC
Bid Date: Jul 05 2019
Fort Mill, SC
Bid Date: May 09 2025
Fort Mill, SC
Bid Date: May 12 2025
Fort Mill, SC
Bid Date: May 16 2025
Fort Mill, SC
Bid Date: Jun 05 2025
Fort Mill, SC
Bid Date: Aug 05 2025
Fort Mill, SC
--
Fort Mill, SC
--
Fort Mill, SC
Bid Date: May 05 2025
Fort Mill, SC
Bid Date: Apr 30 2025
Fort Mill, SC
--
Fort Mill, SC
Bid Date: Mar 27 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.