BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 12, 2025 at 8:00 PM

Updated August 13, 2025

Site work for a water / sewer project in Millsap, Texas. Completed plans call for site work for a water / sewer project.

Installation of approximately 23,400 linear feet of 16" PVC water line by open cut, 724 linear feet of 16" PVC water line by bore with steel encasement, 1,235 linear feet of 18" HDPE water line by bore without encasement, 3,170 linear feet of 4" PVC water line by open cut, 190 linear feet of 6" HDPE water line by bore without encasement, gate valves, connections to existing lines, appurtenances, and miscellaneous items of construction associated with the project as shown and as specified. Bonds: Bid 5 % Performance 100 % Payment 100 %. Question Deadline 04/24/2025 All questions must be submitted to the Engineer via email at chris.hay@e-ht.com. 1. Installation of approximately 28,750 linear feet of 16" C900 DR 18 PVC water line by open cut including bedding, backfill, metallic marking tape, tracer wire, fittings, restraints, thrust blocking, pipeline markers, and other related items. 2. Installation of approximately 725 linear feet of 16" C900 DR18 PVC water line by bore with steel casing, including steel casing pipe, carrier pipe, casing spacers, and casing end seals and other related items. 3. Installation of approximately 1,235 linear feet of 18" DIPS DR11 HDPE water line by bore without encasement, including MJ adapters, reducers, restraints, and other related items. 4. Installation of approximately 3,170 linear feet of 4" C900 DR 18 PVC water line by open cut including bedding, backfill, metallic marking tape, tracer wire, fittings, restraints, thrust blocking, pipeline markers, and other related items. 5. Installation of approximately 190 linear feet of 6" DIPS DR11 HDPE water line by bore without encasement, including MJ adapters, reducers, restraints, and other related items. 6. Installation of valves, fittings, appurtenances, and other items related to construction of water lines indicated on the Drawings. 7. Observing and following easement conditions as shown on the Drawings and restoration of easement area to existing or better conditions, including all conditions indicated for each specific easement property. Construction MBE 24.50% ; WBE 11.34% Non-Construction MBE 24.05% ; WBE 19.35% Total Combined Construction And Non-Construction MBE 24.16% ; WBE 17.38%

Award

Water / Sewer

$5,968,000.00

Public - County

Site Work

29

17

2

7

Subscribe For Documents

90 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
300
Active Projects
163
Bidding Soon
2,880
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.