Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 7, 2025 at 8:00 PM
Updated May 8, 2025
Renovation of a multi-residential development in Chicago, Illinois. Working plans call for the renovation of a multi-residential development.
As of 5/7/2025 this project has been cancelled. No additional information is available at this time. The Procurement Specialist identified below is the sole point of contact regarding this RFP from the date of issuance until the successful proposer(s) selection. Raymond Adams, Senior Procurement Specialist Chicago Housing Authority Department of Procurement and Contracts 60 East Van Buren Street, 8th Floor Chicago, Illinois 60605 E-mail: Radams@thecha.org Questions regarding clarification or verification of these specifications and CHA Contract requirements must be submitted via the Supplier Portal no later than Tuesday, April15, 2025, by 10:00 AM, CDT. The Chicago Housing Authority (CHA) seeks turnkey proposals from qualified vendors to modernize and expand its camera system by integrating the latest technology. The project includes upgrading 5,288 existing cameras to a minimum of 4K resolution, adding 1,674 new cameras at monitored locations to enhance coverage, and implementing new Genetec systems at thirteen additional sites. Price proposals must include all equipment, materials, and labor. The CHA also requires technical support, updates, and replacement plan. These upgrades aim to improve video quality, analytics, incident, and performance tracking, provide tamper protection, allow for enhanced reporting capabilities, and correct or remove vulnerabilities in the current system. Additionally, the enhancements will support scalability and expand storage capacity. The resulting contract from this Request for Proposal (RFP) will be issued in the third quarter of 2025. The CHA launched its Surveillance Cameras Initiative in 2009, incorporating it into its senior and family housing portfolios. This initiative significantly enhanced the CHA's security infrastructure, aligning with its strategic goals of protecting investments and ensuring operational security. The centralized video surveillance system deployed across CHA properties connects directly to the Office of Emergency Management and Communications and the Chicago Police Department, enabling timely and informed responses to incidents. The system was also designed to accommodate the future expansion of CHA properties. CHA anticipates awarding a firm fixed-rate contract for a base period of three years. As determined by HUD, no award will be made to any respondent listed as ineligible to receive contracts from CHA or the Federal Government. Respondents must submit proposals addressing all components of this RFP. CHA reserves the right to select one or more respondents through this solicitation. The planned upgrade will be executed incrementally, with approximately 33% of the project completed annually over a three-year period. ARTICLE III STATEMENT OF WORK/SCOPE OF SERVICES SCOPE OF SERVICES The selected respondent must upgrade infrastructure across approximately 216 sites, including senior, family, and scattered sites, headquarters, and other remote facilities. This includes replacing 146 servers, 146 SV 16s, and 5,288 existing cameras that are approaching End of Life (EOL), End of Service (EOS), or are out of service. Additionally, 1,674 new cameras will be installed to enhance coverage across all existing Genetec sites. Upgrades must include the necessary infrastructure and connectivity to support these additional cameras. Pricing must include labor, material, equipment, travel, etc. Furthermore, complete Genetec systems will be deployed at thirteen locations that do not currently have a Genetec system. This includes installing approximately 800 cameras, cabling, AIO (All in One) security appliances, servers, software, switches, and all other necessary components to make these sites fully operational. The respondent must also provide a comprehensive maintenance and support plan for all newly installed equipment. The respondent must ensure that all existing cameras and equipment are properly recycled in compliance with applicable laws and ordinances. Installation areas must be cleaned, with all garbage and debris removed, and restored to their pre-installation condition. Any visible alterations to walls, ceilings, or other building components must be repaired. The respondent is responsible for complying with all relevant regulations, laws, and ordinances throughout the project. The new servers, storage, cameras, and additional equipment and infrastructure must seamlessly integrate into the existing network and function effectively with the current recording and monitoring systems and platforms. All work will be performed on and in an occupied senior resident building. All precautions, provisions and phased scheduling needs to be incorporated accordingly to ensure resident safety, minimize resident impact and inconvenience. Elevator usage must be limited to minimize resident inconvenience. Resident access to elevators must be prioritized over contractor movement. Work areas must be kept clean and free of obstruction while work is being completed. All work areas must be left clean, and without debris or work materials at the conclusion of the workday or upon completion of the work. Question Deadline 04/15/2025 at 10:00 AM CT Questions regarding clarification or verification of these specifications and CHA Contract requirements must be submitted via the Online Portal
Final Planning
Multi-Residential
$56,000.00
Public - City
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
8
Trades Specified
Division 00 - Lorem Ipsum
Division 23 - Heating Ventilating and Air Conditioning
Division 28 - Electronic Safety and Security
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2025
June 4, 2025
Multiple Locations, Chicago, IL
Related To This Project
Chicago, IL
Bid Date: Apr 21 2025
Chicago, IL
--
Chicago, IL
Bid Date: May 07 2025
Chicago, IL
--
Chicago, IL
Bid Date: May 14 2025
Chicago, IL
Bid Date: May 12 2025
Chicago, IL
Bid Date: May 01 2025
Chicago, IL
Bid Date: Apr 25 2025
Chicago, IL
--
Chicago, IL
Bid Date: May 07 2025
Chicago, IL
Bid Date: Apr 29 2025
Chicago, IL
Bid Date: Apr 11 2025
Chicago, IL
--
Chicago, IL
--
Chicago, IL
Bid Date: Apr 15 2025
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Find. Bid. Win. Your Next Project Starts Here.
ConstructConnect gives you the tools to search, analyze, and bid on verified commercial projects before your competition. Explore detailed project data, bidding timelines, and contact info—right when you need it.
Sign up now to get free company and project data instantly. No payment required.
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.