BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 9, 2025 at 8:00 PM

Updated June 11, 2025

Renovation of a mixed-use development in Galesburg, Michigan. Completed plans call for the renovation of a educational facility.

GACS reserves the right to delay the opening of bids, reject any and all bids, and to waive omissions, irregularities or clerical errors not affecting substantial compliance with the plans and specifications. Galesburg Augusta Community Schools is in compliance with the Asbestos Hazard Emergency Response Act, AHERA. The building may have asbestos containing building materials, ACBM, and presumed asbestos containing building materials, PACBM, in identified locations. Consult the building AHERA plan in the Main Office for specific Galesburg-Augusta Community School Filter First Healthy Hydration Project 2 location(s). All materials utilized in this / these project(s) must be asbestos and lead free. In accordance with MiOSHA regulations, contractor employees who work in areas where they may contact, but not disturb asbestos containing materials, must receive asbestos awareness training from their employer. The Contractor will complete the project based on specifications listed below and all manufacturer instructions related to the use of the products selected. The scope of this project is to bring the district into compliance with Michigan Clean Drinking Water Access Act known as Filter First. This involves removal of existing non-compliant fixtures and installation of new compliant fixtures, as well as modification of existing fixtures to bring them into compliance. Fixtures include but are not limited to bubblers, bottle fillers, drinking fountains, water coolers, faucets, ice machines, and pot fillers. Provide a filter for each fixture upon installation and one replacement filter for each fixture. Provide and install all necessary drainage fittings, water supplies, electrical cords, mounting hardware, etc. for complete installation. Provide and install any plate, cover, panel, trim, or any other item necessary for a clean and Owner acceptable final appearance. Any questions should be referred to Frank Couch - Facilities Director at 269-484-2146 or frank.couch@garams.org. Galesburg-Augusta Primary School 315 W Battle Creek St. Galesburg, MI 49053 Galesburg-Augusta High School 1076 n 37th St. Galesburg, MI 49053 Galesburg-Augusta Middle School 750 W Van Buren Ave Augusta, MI 49012

Award

Educational

$55,289.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
201
Active Projects
128
Bidding Soon
1,398
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2025

May 5, 2025

Project location map

Multiple Locations, Galesburg, MI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.