Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 29, 2025 at 8:00 PM
Updated June 21, 2025
Site work for a water / sewer project in San Antonio, Texas. Completed plans call for site work for a water / sewer project.
The City of San Antonio (City), Public Works Department (PW) is issuing a Request for Competitive Sealed Proposals (RFCSP) for qualified firms (Respondents) to provide construction services for the Seeling Drainage Phase 4 (Lowery Drive to St. Cloud and Placid Drive from Sage Drive to Pardo Circle) (Project). The project consists of the construction of Seeling Drainage Phase 4 (Lowery Drive to St. Cloud and Placid Drive from Sage Drive to Pardo Circle), a 2022 Bond Program project. Located in Council District 7, area residents have reported localized drainage issues of storm runoff entering their property. The proposed project will construct underground drainage infrastructure upstream of the previously completed Seeling Channel Phase 3 project, a COSA 2017 Bond project. The project will mitigate localized drainage issues and increase safety and mobility within the project area. M/WBE 14% AABE 1% This construction project entails, but is not limited to, the installation of an underground storm- drain system and associated roadway reconstruction to include curbs, sidewalks, water, sewer, gas improvements, driveway approaches and any other work required for the completion of the project as designed in the project plans and specifications as applicable and within available funding. This is a multi-phase and Hazard Mitigation Action Plan project. Additionally, two (2) alternates are being proposed for this project: 1.- Reconstruction of Placid Drive from Sage Drive to Pardo Circle to include, but not limited to, the installation of an underground storm drain system, curbs, sidewalks, water, sewer, gas improvements, and driveways. 2.- Reconstruction of Placid Drive from Pardo Circle to Seeling Boulevard to include, but not limited to, the curbs, sidewalks, and driveways. Construction Cost Estimate: $22,741,177 JOB NO. 23-5534, 23-5036, 23-5534
Post-Bid
Water / Sewer
$22,741,177.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 6, 2025
August 5, 2025
Multiple Locations, San Antonio, TX
Related To This Project
San Antonio, TX
Bid Date: Apr 22 2025
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: May 06 2025
San Antonio, TX
Bid Date: May 23 2025
San Antonio, TX
--
San Antonio, TX
Bid Date: May 09 2025
San Antonio, TX
Bid Date: Apr 10 2025
San Antonio, TX
Bid Date: Apr 16 2025
San Antonio, TX
Bid Date: Apr 25 2025
San Antonio, TX
--
San Antonio, TX
--
San Antonio, TX
Bid Date: Apr 25 2025
San Antonio, TX
Bid Date: Aug 08 2019
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
