BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 30, 2025 at 8:00 PM

Updated May 31, 2025

Site work for a mixed-use development in Indian Shores, Florida. Completed plans call for site work for a development.

Secure job site. Install erosion control and pedestrian fencing as required. Reconstruction of four (4) separate retention areas per the original construction plans prepared by G. F. Young, Inc. for the following locations: 190th Avenue Beach Access; 197th Avenue Beach Access; 198th Avenue Beach Access;199th Avenue Beach Access; Remove excess sand, debris, dirt, gravel, and grass from the retention areas. Re-establish the retention pond's location, top of bank elevation and the pond's bottom elevation. Haul off excess sand and spoils. Sod ponds and replant Sea Oats as noted on the plans. Contractor to provide asbuilt survey of each retention area for the Engineer's review and approval. All prospective respondents are hereby cautioned not to contact any member of the Town of Indian Shores Town Council, Town Staff, or Town Officials other than the specified contact person concerning this project. Question Deadline 04/16/2025 Submit questions to cporter@myindianshores.com Anticipated Award Date: April 28, 2025 Demolition/Site Prep Secure jobsite.Install erosion control and pedestrian fencing asrequired. Retention Areas Locations Reconstruction of four (4) separate retention areas per the original construction plans prepared by G. F. Young, Inc. for the following locations: 190 th Avenue Beach Access; Dated 01/2007; Project #0111019104 197 th Avenue Beach Access; Dated 01/2004; Project #0111019101 198 th Avenue Beach Access; Dated 01/2004; Project #0111019101 199 th Avenue Beach Access; Dated 01/2004; Project #0111019101 Retention Areas Work Remove excess sand, debris, dirt, gravel, and grass from the retention areas. Re-establish the retention pond's location, top of bank elevation and the pond's bottom elevation. Haul off excess sand and spoils. Sod ponds and replant Sea Oats as noted on the plans. Retention Areas Completion Contractor to provide asbuilt survey of each retention area for the Engineer's review and approval

Award

Conservation and Development

$117,300.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

8

Subscribe For Documents

26 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
271
Active Projects
131
Bidding Soon
1,608
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 23, 2025

May 1, 2025

Project location map

Multiple Locations, Indian Shores, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.