BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 6, 2025 at 8:00 PM

Updated June 7, 2025

Site work for a road / highway in Wildwood, Missouri. Working plans call for site work for a road / highway.

Sealed bid documents is determined by the Department of Planning and Parks, not that of the bidder. The Scope of Work includes: the installation of a new vehicular gate and associated fencing, inclusive of required solar powered gate opener with remote, key pad and Knox Boxes identified on the bid plans and specifications, along with the necessary site preparation work, as needed and defined therein as well. Not less than the prevailing hourly rate of wages shall be paid to all workmen performing under this contract in this area according to the current rates determined by the Department of Labor and Industrial Relations of the State of Missouri. The City of Wildwood shall award any contract based on the proposal that, in its sole discretion, best meets the interests and requirements of the City. The City of Wildwood reserves the right in its sole discretion to reject any, or all proposals, to waive technicalities or deficiencies in any or all the proposals, to negotiate with any or all bidders or others for other or more favorable terms or prices, and/or to award the contract to other than the bidder submitting the lowest cost proposal, with or without negotiation. Please be advised regarding the following considerations: a. RSMo Section 285.530 requires that any business entity awarded a public contract must provide an affidavit and documentation affirming enrollment in a federal work authorization program (E-Verify) b. Section 292.675.5 RSMo requires the contractor to "ensure that all on-site employees of the contractor, subcontractors, and suppliers have successfully completed" 10 hours of OSHA construction safety training. This applies to public works projects valued over $40,000. This project is tax exempt. A tax exemption letter will be made available to the successful bidder upon request.

Final Planning

Roads / Highways

$18,933.00

Public - City

Site Work

3

5

5

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
96
Bidding Soon
1,224
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 22, 2025

November 21, 2025

Project location map

Strecker Rd & Turnberry Pl Dr, Wildwood, MO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.