Published January 13, 2026 at 7:00 PM

Updated January 14, 2026

Site work and paving for a bridge / tunnel in Bridgewater Corners, Vermont. Working plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

**As of January 13, 2025, project was on hold due to the changes of funds. There was no definite timeline when will the project be awarded.** Type of Construction: Install one lane temporary bridge to maintain access and removal after completion of project. Excavate roadway approach behind abutment #1 as recommended by the Town's Consultant Engineer. Scouring report, drawing and backfill information will be provided at mandatory meeting. The roadway approach shall be reconstructed which shall include the roadway Subbase material and pavement. Contract Completion Date: The Contract completion date is subject to the actual time the contractor is allowed in the stream per ANR requirements. Bid opening will occur at the regular Selectboard meeting on January 13, 2026, at 4:30 p.m. Sealed BIDS shall be marked in the lower left-hand corner Bid Documents: Bridge #28 Location GPS 43.57059N - 73.664753W Question: During the advertisement phase of this project all questions shall be addressed solely to Randy Kennedy - Road Foreman or Stephen S Tarleton, Road Commissioner.

Final Planning

Bridges / Tunnels

$400,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
321
Active Projects
192
Bidding Soon
1,706
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 12, 2026

June 1, 2026

Project location map

Hale Hollow Rd, Bridgewater Corners, VT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.