BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published January 23, 2026 at 7:00 PM

Updated January 24, 2026

This is a service / maintenance or supply contract in Hartford, Vermont. Contact the soliciting agency for additional information.

The White River Junction VA Medical Center requires a qualified contractor to replace the failed C-2 heat exchanger and associated piping and equipment in Building 1 mechanical room 14. The scope of work includes: removal and disposal of the existing C-2 heat exchanger, air separator, and flash tank; removal and disposal of all piping, pipe connections, and valves between or near these components that are non-compliant or not serviceable (threaded pipe fittings are not permitted); removal and salvage for reinstallation of the two circulator pumps; installation of a new heat exchanger, air separator with auto vent, and flash tank; reinstallation of the circulator pumps (preferably at the same horizontal level or as near as possible); installation of new piping and fittings to reconnect components; insulation of all newly installed equipment and piping; functional testing to ensure proper flows and operational temperatures; and startup of system and equipment. Work must be conducted to minimize impact to healthcare facility operations, staff, and patients, with Infection Control measures (ICRA) required at all times and construction activity coordinated with VA personnel. The replacement equipment must be equivalent to and capable of providing the same operational conditions as the existing equipment, per the as-built drawing and nameplate specifications. Contractor must employ licensed pipefitters and qualified technicians with required trade school and experience, and personnel must be familiar with and have access to relevant codes and standards (NFPA 85, VHA Boiler Manual, TEMA standards, ASME code). The contractor is responsible for providing all labor, equipment, tools, materials, supplies, transportation, supervision, and any other items necessary to perform the work. Proper VA lock out/tag out procedures must be followed. Submittals must be reviewed and approved by the VA prior to starting work. Contractor is responsible for construction debris removal, providing its own dumpster, and using sealed dump/HEPA carts, with approved debris removal pathways. Work must conform to the required time schedule, and the contractor must notify facility management and the COR at least two weeks prior to on-site work. Work is to be performed during normal business hours unless otherwise approved. Contractor personnel must follow all VA Privacy & Security policies and records management requirements. The period of performance shall not exceed 80 days from notice to proceed. All bidders must submit a firm fixed price quote, a completed and signed Limitation of Subcontracting, a proposal outlining technical capabilities in accordance with the Statement of Work, and organize the submission in order of the evaluation criteria. Submission should include a statement of agreement with terms and conditions, or list any exceptions and rationale.

Post-Bid

Medical

$10,000,000.00

Public - Federal

Service, Maintenance and Supply

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
298
Active Projects
135
Bidding Soon
1,564
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

January 23, 2026

February 25, 2026

Project location map

163 Veterans Dr, Hartford, VT


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.