BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 11, 2026 at 8:00 PM

Updated June 12, 2026

Renovation of a water / sewer project in Attleboro, Massachusetts. Conceptual plans call for the renovation of a water / sewer project.

This capital project entails the construction/upgrades needed to improve the pump station, including the following: (a) replacing two 15-HP pumps, two 6 - inch check valves, two 8-inch gate valves, and in in-line grinder in the wet well influent channel, (b) HVAC improvements include replacing the existing fans, temperature controls, dehumidifier, and a portion of the duct work, (c) replacing the sump pump, (d) replacing the existing generator, addition of variable frequency drive, addition of a gas detection system in the wet well, (e) replacing the existing roof with a new membrane roof; minor structural improvements are anticipated but no significant renovations -hatch relocations, addition of a monorail, and replacing the stairs are included in the cost), (f) replacing the existing bubbler system wither either a level or pressure sensor system, and (g) miscellaneous electrical improvements. The new equipment will be energy efficient. The new equipment will be energy efficient. The pumping station has been online since 1980 and has never received any major upgrades. Since it went online, the flow to the pump station has increased considerably. The equipment is well beyond its useful life expectancy The project is included in the City's 2027-2031 Capital Improvement Program (CIP) As of June 11, 2026 , further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Water / Sewer

$2,500,000.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
800
Active Projects
480
Bidding Soon
5,219
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 1, 2029

Project location map

Rutledge Dr, Attleboro, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.