BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2025 at 8:00 PM

Updated April 30, 2025

Site work for a water / sewer project in Lubbock, Texas. Completed plans call for site work for a water / sewer project.

The vendor is to provide factory trained technical staff to develop layout drawings, piping modifications, pump replacement, motor replacement, and startup services for the replacement of two Wastewater Chopper Pumps and appurtenances at the Southeast Water Reclamation. Questions Due Date: Apr 18th 2025, 2:00 PM CDT Online Portal 1.1.The vendor shall be responsible for attending pre-bid meetings and gathering onsite data collection including site conditions, pipe measurements and type, flow conditions, and all pertinent information needed to submit a complete proposal to replace all needed elements to replace existing chopper pumps. 1.2.Vendor shall include with their proposal shop drawings that detail all proposed pumps, motors, piping adapters, reducer spools, pedestal modifications and/or replacements, dresser couplings, etc. to make the chopper pumps fit into place, as intended. 1.3.The vendor will gather onsite required measurements to determine exact piping and pedestal modifications needed to replace two (2) vertical pedestal mounted chopper pumps. 1.4.Using the field data gathered, the vendor shall submit proposed shop drawings to the City including measurements depicting all proposed pedestal and piping modifications to accept the new pumps. 1.5.After review and approval by the City, the vendor shall supply all proposed pumps, motors, piping adapters, reducer spools, pedestal modifications and/or replacements, dresser couplings, etc. to make the chopper pumps fit into place, as intended. All components shall be delivered to the job site and thoroughly inspected before installation work begins. 1.6.The vendor shall coordinate dismantling of existing equipment with City's representative to prepare for the installation the new equipment. Removal of old pumps and associated components will need to be performed. 1.7.The vendor shall utilize the existing concrete mounting pedestal and install any necessary framing pedestals between the pump assembly and the concrete pedestal. The pedestal shall withstand vibration associated with normal operating conditions. 1.8.The vendor shall coordinate delivery of all equipment with the Owner's Representative. All equipment shall be furnished as outlined within these specifications. No additional purchases shall be required to make the unit(s) operational as specified. 1.9.In addition, the vendor shall be responsible for complete installation of required piping and pedestal modifications to accept the new chopper pumps and motors. 1.10. The vendor shall furnish all staffing, tools, supplies, and equipment to completely install the new pumps and motors described within the specifications.

Bid Results

Water / Sewer

$256,878.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
33
Active Projects
17
Bidding Soon
208
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

May 23, 2025

Project location map

3603 Guava Ave, Lubbock, TX

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.