BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 24, 2025 at 8:00 PM

Updated June 25, 2025

Site work and paving for a mixed-use development in Fredericksburg, Virginia. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

Sealed bids are invited for the construction of the Repair and Replace Concrete Sidewalk Near Workforce Bldg. at Germanna Community College, Fredericksburg Campus, Project Code # M24GC230 located in Fredericksburg, Virginia. The project is generally described as repair of a utility trench top and the replacement of sidewalk sections and removal of trees to make the sidewalk ADA compliant. In person hand delivery is supported on bid day at the stated location. Building is open during regular business hours. All visitors need to sign in at the virtual receptionist (iPad on the wall in the main lobby.) Bids may be modified as per the Instructions to Bidders using fax number (804) 819-4762 and copying sroberts@vccs.edu. A Standard Commonwealth Bid Bond. Procedures for submitting a bid, claiming an error, withdrawal of bids and other pertinent information are contained in the Instructions to Bidders, which is part of the Invitation for Bids. Withdrawal due to error in bid shall be permitted in accord with Section 9 of the Instructions to Bidders and 2.2-4330, Code of Virginia. The Owner reserves the right to reject any or all bids. The contract shall be awarded on a lump sum basis as follows: the Total Base Bid Amount including any properly submitted and received bid modifications plus such successive Additive Bid Items as the Owner in its discretion decides to award in the manner set forth in Paragraph 12 of the Instructions to Bidders. 'Notice of Award' will be posted online. Contractor registration is required in accordance with Section 54.1-1103 of the Code of Virginia. See the Invitation for Bids for additional qualification requirements. All executive branch agencies are directed to advance Executive Order 35, dated July 3, 2019. The undersigned understands that time is of the essence and agrees that the time for Substantial Completion of the entire project shall be 45 consecutive calendar days from the date of commencement of the Work as specified in the Notice to Proceed, and Final Completion shall be achieved within 30 consecutive calendar days after the date of Substantial Completion as determined by the A/E. *NOVAS Construction requesting the following Trades Needed: Concrete, Caulking, Demolition Do not contact: Owner, Architect, Engineer, or any parties on the bid package.

Award

Sidewalks / Parking Lot

$52,436.00

Public - State/Provincial

Paving, Site Work

6

16

5

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
99
Active Projects
2
Bidding Soon
1,523
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 7, 2025

June 16, 2025

Project location map

10000 Germanna Point Dr, Fredericksburg, VA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.