BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 1, 2025 at 8:00 PM

Updated May 10, 2025

Site work for a water / sewer project in Hilo, Hawaii. Completed plans call for site work for a water / sewer project.

The estimated cost of construction is between $100,000 and $200,000. The scope of work consists of replacing the existing fiberglass clevis hangers with new stainless steel clevis hangers at Pier 1 located at 90 Kuhio Street, Hilo, Hawaii 96720. All Request for Information (RFI) questions and Substitution Requests shall be submitted via HIePRO no later than April 22, 2025, at 2:00 p.m., HST. RFI questions received after the stated deadline will not be addressed. Substitution Requests received after the stated deadline shall not be considered. The work to be done under this project includes furnishing of all labor, material, and equipment necessary to replace the existing fiberglass clevis hangers with a new stainless steel clevis hangers at Pier 1, Hilo Harbor, Hawaii. Bidders are advised to examine the existing conditions at the project site to familiarize themselves with the nature and extent of work involved. Appointments may be made with the State Harbors Division Maintenance Engineer for clarification of the work involved and the character and quality of materials specified. 10.2 SCOPE OF WORK - The major items of work to be done includes, but is not necessarily limited to, the following major items of work: A. Mobilization B. Provide a Best Management Practices (BMP) Plan C. Furnish and installation of new stainless steel clevis hangers. D. Removal of existing fiberglass clevis hangers, patch and repair existing to match adjacent surfaces. Verbal RFI(s) shall not receive a response. All responses to RFI questions shall be provided for clarification and information only and issued by formal addendum. Any amendments to the solicitation shall be made by formal addendum and posted in HIePRO. For additional information, contact Branden Sumida, Project Manager, by phone at (808) 587-1873, or by email at branden.sumida@hawaii.gov. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Water / Sewer

$200,000.00

Public - State/Provincial

Site Work

13

6

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
16
Active Projects
5
Bidding Soon
35
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2025

August 1, 2025

Project location map

100 Kuhio St, Hilo, HI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.