Published April 30, 2026 at 8:00 PM

Updated May 21, 2026

Site work for a water / sewer project in Los Angeles, California. Completed plans call for site work for a water / sewer project.

As of April 29, 2026, this project has not yet been awarded. A timeline for the award has not yet been established. In primary sewers along Vermont Avenue from 83rd St to Florence Ave _ Rehab 3,633 LF 27-in dia concrete brick sewer using CIPP lining method, including 23 LF along a curve _ Rehab 13 MHs, including: __ Upsize frame & cover from 24-in to 30-in __ 4 spot repairs __ Repair 437 LF of concrete invert _ Construct 1 new 8-ft MH _ Also: __ Traffic control __ Sewer bypass, odor control, cleaning & CCTV The Board of Public Works anticipated level of MBE participation is 4%, WBE participation is 2%, SBE participation is 25%, EBE participation is 8%, and DVBE participation is 3% Submission of the Business Inclusion Program (BIP) Outreach Documentation is mandatory. All bidders must perform their BIP Outreach Documentation on the City's Regional Alliance Marketplace for Procurement (RAMP) as described in Part III of the Bid Proposal. All bidders must submit this documentation on the Citys RAMP. All BIP outreach documentation including the summary sheet must be submitted on the RAMP's BIP Outreach Reports System and must be submitted by 4:30 p.m. of the following City working day from the date bids are received by the Board of Public Works. Question Deadline 01/28/2026 Requests for clarification of conflicts and omissions from the contract documents shall be addressed in writing to: Amado Carino. All Questions to be directed to the PM & PE via email @ amado.carino@lacity.org & ryan.porras@lacity.org The Vermont Avenue East Primary Sewer Rehabilitation Project will rehabilitate 3,633 linear feet of existing 27" diameter concrete brick sewer using Cured in Place Pipe (CIPP) lining method, which includes 23 Linear Feet of 27" diameter concrete brick sewer along a curve. The project will rehabilitate 13 maintenance holes, upsize frame and cover from 24 inch to 30-inch, 4 spot repairs, repair 437 linear feet of concrete invert, and construct a new 8-foot maintenance hole. The proposed alignment is located along Vermont Avenue from 83rd Street to Florence Avenue. The scope of work includes traffic and odor control, sewer bypass, cleaning and CCTV inspection of the sewer.

Bid Results

Water / Sewer

$5,525,606.00

Public - City

Site Work

74

30

41

7

Subscribe For Documents

96 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
580
Active Projects
276
Bidding Soon
4,223
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2026

May 18, 2026

Project location map

Vermont Ave, Los Angeles, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.