Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 30, 2026 at 8:00 PM
Updated May 21, 2026
Site work for a water / sewer project in Los Angeles, California. Completed plans call for site work for a water / sewer project.
As of April 29, 2026, this project has not yet been awarded. A timeline for the award has not yet been established. In primary sewers along Vermont Avenue from 83rd St to Florence Ave _ Rehab 3,633 LF 27-in dia concrete brick sewer using CIPP lining method, including 23 LF along a curve _ Rehab 13 MHs, including: __ Upsize frame & cover from 24-in to 30-in __ 4 spot repairs __ Repair 437 LF of concrete invert _ Construct 1 new 8-ft MH _ Also: __ Traffic control __ Sewer bypass, odor control, cleaning & CCTV The Board of Public Works anticipated level of MBE participation is 4%, WBE participation is 2%, SBE participation is 25%, EBE participation is 8%, and DVBE participation is 3% Submission of the Business Inclusion Program (BIP) Outreach Documentation is mandatory. All bidders must perform their BIP Outreach Documentation on the City's Regional Alliance Marketplace for Procurement (RAMP) as described in Part III of the Bid Proposal. All bidders must submit this documentation on the Citys RAMP. All BIP outreach documentation including the summary sheet must be submitted on the RAMP's BIP Outreach Reports System and must be submitted by 4:30 p.m. of the following City working day from the date bids are received by the Board of Public Works. Question Deadline 01/28/2026 Requests for clarification of conflicts and omissions from the contract documents shall be addressed in writing to: Amado Carino. All Questions to be directed to the PM & PE via email @ amado.carino@lacity.org & ryan.porras@lacity.org The Vermont Avenue East Primary Sewer Rehabilitation Project will rehabilitate 3,633 linear feet of existing 27" diameter concrete brick sewer using Cured in Place Pipe (CIPP) lining method, which includes 23 Linear Feet of 27" diameter concrete brick sewer along a curve. The project will rehabilitate 13 maintenance holes, upsize frame and cover from 24 inch to 30-inch, 4 spot repairs, repair 437 linear feet of concrete invert, and construct a new 8-foot maintenance hole. The proposed alignment is located along Vermont Avenue from 83rd Street to Florence Avenue. The scope of work includes traffic and odor control, sewer bypass, cleaning and CCTV inspection of the sewer.
Bid Results
Water / Sewer
$5,525,606.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 18, 2026
May 18, 2026
Vermont Ave, Los Angeles, CA
Related To This Project
Los Angeles, CA
Bid Date: Apr 17 2025
Los Angeles, CA
Bid Date: Apr 11 2025
Los Angeles, CA
Bid Date: May 29 2025
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Apr 25 2025
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
--
Los Angeles, CA
Bid Date: Apr 10 2025
Los Angeles, CA
--
Los Angeles, CA
Bid Date: May 05 2025
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
