BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 26, 2025 at 8:00 PM

Updated June 27, 2025

Site work for a mixed-use development in Naples, Florida. Conceptual plans call for site work for a playground / park / athletic field; and water / sewer project.

Question Submission Deadline: April 22, 2025, 11:59pm Preliminary Engineering Phase 1 Services 1. Attend project kick-off meeting with representatives of Volusia County, the City of Orange City, and Florida Department of Transportation (FDOT). 2. Prepare a topographic survey. 3. Identify all known existing utilities within the project limits. 4. Conduct pre-application meeting with the St. Johns River Water Manamement District (SJRWMD) 5. Prepare a preliminary ICPR (Interconnected Channel and Pond Routing) model. 6. Prepare 30% conceptual plans. 7. Coordinate with FDOT regarding the crossing of U.S. Highway 17/92. 8. Identify drainage easements. 9. Conduct progress meetings with County and City staff. 10. Participate in a County Council and City Council presentation. 11. Prepare a technical memorandum documenting Phase 1 Services. Final Design and Permitting Phase 2 Services 1. Perform geotechnical services. 2. Perform Subsurface Utility Engineering (SUE) services. 3. Prepare 60% construction plans. 4. Prepare 60% cost estimate. 5. Update the ICPR (Interconnected Channel and Pond Routing) model. 6. Prepare an engineering report. 7. Conduct progress meetings with County and City staff. 8. Prepare 90% construction plans. 9. Prepare the draft project manual and supplemental technical specifications. 10. Prepare 90% cost estimate. 11. Participate in a County Council and City Council presentation. 12. Prepare and submit an Environmental Resource Permit (ERP) application to the SJRWMD. 13. Address request for information comments from the SJRWMD. 14. Prepare and submit a right-of-way permit application to the FDOT. 15. Prepare easement documents (sketches and descriptions). 16. Prepare 100% construction plans. 17. Prepare the final project manual and supplemental technical specifications. 18. Prepare 100% cost estimate. 19. Prepare a technical memorandum documenting Phase 2 Services. Awarded to : Jones Edmunds & Associates, Inc.

Conceptual

Playgrounds / Parks / Athletic Fields

$1,220,000.00

Public - County

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
103
Active Projects
55
Bidding Soon
600
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.