BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 15, 2025 at 8:00 PM

Updated July 16, 2025

Renovation of a water / sewer project in Buford, Georgia. Completed plans call for the renovation of a water / sewer project.

**As of July 15, 2025, this project has not yet been awarded. A timeline for the award has not yet been established.** Questions regarding bids should be directed to Brittany Bryant, CPPB, Purchasing Associate III, at Brittany.Bryant@GwinnettCounty.com or by calling 770-822-7759, no later than 3:00PM on May 08, 2025. Bids are requested for the following services: 1. Supply of all information requested on this bid submittal. 2. Manufacture and assemble a total of 20 gearboxes, motors, and mounting bases in accordance with specifications. Units are to be supplied in two phases. 3. Supply of complete submerged mixer shafts, paddles, couplings, bolts and accessories to connect to the new gearboxes. 4. Submission of specified submittals for approval prior to commencing manufacture. 5. Provide a manufacturing and delivery schedule and provide monthly progress updates. 6. Coordination and delivery to Lanier Filter Plant (LFP) warehouse, 2601 Buford Dam Road, Buford, GA 30518. 7. Installation, test run and start up assistance to the installation contractor (not yet appointed)-see specification Section 01 43 33. There will be a lag between the startups as one (1) train will be installed first and operated for 7 days after startup before commencing installation on the second train. 8. Start-up assistance (see specification Section 01 43 33) should ensure the mixer is checked for alignment, balance to ensure the installation and operates with minimal vibration and oscillation of the shafts. 9. Provide signed Manufacturers Certificate of Proper Installation. 10. Provision of two hard copies and one electronic copy (in searchable PDF format) of Operating and Maintenance instructions and training materials for all components, including drawings of equipment, preventative maintenance schedule, and troubleshooting information (see specification Section 01 78 23). Draft O&M manuals are to be submitted prior to the shipment date of the units. The information is to summarize all equipment provided and highlight requirements for specific units. Generic product information is to be minimized. 11. Supply of specified spare parts (see Section 44 45 19.01) and special tools for future maintenance. 12. Training of Owners staff-one day training following startup of each train Addendum 3: QA - May 13, 2025 Addendum 1: QA -April 17, 2025

Bid Results

Water / Sewer

$616,636.00

Public - County

Renovation

10

12

4

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
346
Active Projects
209
Bidding Soon
2,358
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 16, 2025

July 15, 2025

Project location map

2601 Buford Dam Rd, Buford, GA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.