Published May 1, 2025 at 8:00 PM

Updated May 2, 2025

Site work, paving and outdoor lighting for a mixed-use development in Worcester, Massachusetts. Completed plans call for site work for a sidewalk / parking lot; for outdoor lighting for a sidewalk / parking lot; for paving for a sidewalk / parking lot; transportation facility; transportation facility; and transportation facility.

The work includes: WORK INCLUDES REPLACEMENT OF FOUNDATIONS. CONDUIT WIRE, HANDHOLES, POLES, AND FIXTURES, AND REMOVAL ANlJ RECONSTRUCTION OF SECTIONS OF ASPHALT AND CONCRETE SIDEWALK AND PEDESTRIAN RAMPS. The estimated contract cost is $1,201,333.73 A proposal guaranty shall be submitted with each General Bid consisting of a bid deposit for five (5) percent of the value of the bid; when sub-bids are required, each must be accompanied by a deposit equal to five (5) percent of the sub-bid amount in the form of a bid bond in the name of which the Contract for the work is to be executed. The bid deposit shall be (a) in a form satisfactory to the Authority, (b) with a surety company qualified to do business in the Commonwealth and satisfactory to the Authority, and (c) conditioned upon the faithful performance by the principal of the agreements contained in the bid. The successful Bidder will be required to furnish a performance bond and a labor and materials payment bond, each in an amount equal to 100% of the Contract price. The surety shall be a surety company or securities satisfactory to the Authority. Attention is called to the minimum rate of wages to be paid on the work as determined under the provisions of Chapter 149, Massachusetts General Laws, Section 26 to 27G, inclusive, as amended. The Contractor will be required to pay workers no less than the prevailing wage rates on the schedules listed in Division II, Special Provisions of the Specifications, which wage rates have been established by the U. S. Secretary of Labor and /or the Massachusetts Department of Labor Standards. In the event of a conflict between the two schedules, the higher wage rate shall apply. The successful Bidder will be required to purchase and maintain Bodily Injury Liability Insurance and Property Damage Liability Insurance for a combined single limit of $2,000,000 Said policy shall be on an occurrence basis and the Authority shall be included as an Additional Insured. See the insurance sections of Division I, General Requirements and Division II, Special Provisions for complete details. This contract is subject to a Minority Business Enterprise/Women Business Enterprise participation provision requiring that the Contractor demonstrate good faith efforts that FIVE AND ONE TENTH PERCENT (5.1%) of the Contract be performed by minority business enterprise and/or women business enterprise contractors certified by the Massachusetts Supplier Diversity Office. With respect to this provision, bidders are urged to familiarize themselves thoroughly with the Bidding Documents. Strict compliance with the pertinent procedures will be required for a bidder to be deemed responsive and eligible. This Contract is also subject to Affirmative Action requirements of the Massachusetts Port Authority contained in Division I, Article 79 of the Contract and, to the Secretary of Labor's Requirement for Affirmative Action to Ensure Equal Opportunity and the Standard Federal Equal Opportunity Construction Contract Specifications (Executive Order 11246). The General Contractor is required to submit a Certification of NonSegregated Facilities prior to award of the Contract, and to notify prospective subcontractors of the requirement for such certification where the subcontract exceeds $10,000. Complete information and authorization to view the site may be obtained from the Capital Programs Department Office at the Massachusetts Port Authority. The right is reserved to waive any informality in or reject any or all proposals

Bid Results

Transportation Terminals

$885,656.00

Public - State/Provincial

Outdoor Lighting, Paving, Site Work

17

20

4

4

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
641
Active Projects
171
Bidding Soon
4,739
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 30, 2025

June 30, 2025

Project location map

375 Airport Dr, Worcester, MA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.