Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 23, 2025 at 8:00 PM
Updated June 24, 2025
Site work, paving and outdoor lighting for a mixed-use development in Winnipeg, Manitoba. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.
Reference Number 0000291140 Pricing Lump sum SCOPE OF WORK D3.1 The Work to be done under the Contract shall consist of four parts: (a) Part 1 - City Funded Work (b) Part 2 - Water and Waste Work (c) Part 3 - Traffic Signals Work (d) Part 4 - Manitoba Hydro Funded Work Part 1 - City Funded Work D3.2 Part 1 - City Funded Work shall consist of: (a) Asphalt Pavement Reconstruction (i) Burnell Street from St. Matthews Avenue to Ellice Avenue; (ii) McMicken Street from Ellice Avenue to Sargent Avenue (iii) Kennedy Street / Edmonton Street Alley from York Avenue to St. Mary's Avenue; (iv) Langside Avenue from Cumberland Avenue to Notre Dame Avenue; (b) Major Concrete Pavement Rehabilitation (i) Qu'Appelle Avenue from Balmoral Street to Kennedy Street; and (c) Minor Concrete Pavement Rehabilitation (i) McGee Street from St. Matthews Avenue to Ellice Avenue. Part 2 - Water and Waste Work D3.3 Part 2 - Water and Waste Work shall consist of: (a) Manhole Repairs (i) McGee Street (b) Sewer Repairs (i) McGee Street Part 3 - Traffic Signals Work D3.4 Part 3 - Traffic Signals Work shall consist of: (a) Traffic Signals (i) Burnell Street at St. Matthews Avenue Part 4 - Manitoba Hydro Work D3.5 Part 4 - Manitoba Hydro Funded Work shall consist of: (a) Street Light Installation (i) Burnell Street from St. Matthews Avenue to Ellice Avenue The City currently has no approved funding in the Capital Budget for Part 4 of the Work, but is anticipating receiving notification about funding from Manitoba Hydro by late May 2025. Part 4 of the Work is contingent upon Manitoba Hydro approving sufficient funding. D3.6 The major components of the Work are as follows: (a) Asphalt Pavement Reconstruction (i) Removal of existing sidewalk; (ii) Planing of existing asphalt at intersections as required; (iii) Renewal of existing concrete sidewalk as required; (iv) Tree stump grinding; (v) Construction of 100mm concrete sidewalk; (vi) Installation of detectable warning surface tiles; (vii) Removal of existing pavement; (viii) Removal of existing curb; (ix) Abandon existing catch basins and drainage inlets; (x) Installation of catch basins and sewer service pipes; (xi) Installation of subdrains; (xii) Excavation; (xiii) Compaction of existing sub-grade; (xiv) Adjustment of existing pavement and boulevard structures; (xv) Placement of separation geotextile fabric and Type A geogrid; (xvi) Placement of sub-base material (placed in two lifts); (xvii) Placement of base course material; (xviii) Installation of Traffic Signals conduit, service boxes, and concrete bases; (xix) Construction of select curb types for asphalt pavement, utilizing slip-form paving equipment; (xx) Construction of modified barrier curb with reversed gutter for asphalt pavement; (xxi) Construction of curb ramp for asphalt pavement; (xxii) Construction of 150mm concrete pavement (plain-dowelled) for inlet isolations for asphalt pavement; (xxiii) Construction of modified barrier curb; (xxiv) Construction of curb ramp; (xxv) Construction of 40mm lip curb (separate); (xxvi) Renewal of existing curb as required; (xxvii) Renewal of existing curb ramp; (xxviii) Renewal of existing curb and gutter as required; (xxix) Boulevard restoration and sod; (xxx) Placement of asphalt pavement (Type MS2, 55mm thickness); (xxxi) Placement of asphalt pavement (Type MS1, 70mm thickness); (xxxii) Placement of asphalt pavement tie-ins; (xxxiii) Planing or removal of existing asphalt for asphalt speed hump; and (xxxiv) Construction of asphalt speed hump, as required. (b) Concrete Pavement Rehabilitation (Major/Minor) (i) Removal of existing asphalt, as required, (ii) Renewal of existing concrete sidewalk; (iii) Excavation; (iv) Compaction of sub-grade; (v) Installation of geotextile; (vi) Placement and compaction of sub-base material; (vii) Installation of geogrid; (viii) Placement and compaction of base material; (ix) Construction of new concrete sidewalk; (x) Renewal or construction of curb ramps; (xi) Installation of detectable warning surface tiles; (xii) Abandoning existing drainage inlets; (xiii) Removal of existing catch pits; (xiv) Installation of new catch pits; (xv) Installation of new catch basins; (xvi) Connecting new pipe to existing sewer or existing catch basins; (xvii) Repair of existing catch basin leads; (xviii) Full depth concrete repairs of existing slabs and joints; (xix) Adjustment of existing pavement and boulevard structures; (xx) Renewal of existing curb as required; (xxi) Construction of modified barrier curb; (xxii) Boulevard grading; (xxiii) Placement and compaction of topsoil; (xxiv) Installation of pavement repair fabric (Type B); (xxv) Placement of main line asphalt pavement overlay (Type MS1); (xxvi) Placement of asphalt pavement at tie-ins and approaches (Type MS1); and (xxvii) Placement of sod. (c) Water and Waste Work (i) External point repairs to existing sewer mains (ii) Replacement of manhole risers (iii) External point repairs of existing sewers; (iv) Repairs to manhole structures; and (v) Sewer and sewer service video inspection. (d) Traffic Signals Work (i) Installation of traffic signals conduit, service boxes, and concrete bases. (e) Street Light Installation (i) Installation and removal of temporary overhead spans; (ii) Removal of existing street light poles and bases; (iii) Installation of new pre-cast concrete bases including luminaires and appurtenances; (iv) Installation of new street lighting cables in conduit (boring) and street light poles, including cable termination; and (v) Installation of ground rods. The Bidder shall include in their Bid Submission bid security in the form of a digital bid bond, in the amount of at least ten percent (10%) of the Total Bid Price, and agreement to bond of a company registered to conduct the business of a surety in Manitoba, in Form G1 (a) a performance bond of a company registered to conduct the business of a surety in Manitoba, in the amount of fifty percent (50%) of the Contract Price; and (b) labour and material payment bond of a company registered to conduct the business of a surety in Manitoba, in an amount equal to fifty percent (50%) of the Contract Price. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform. Question Deadline 04/16/2025
Award
Roads / Highways
$3,891,774.00
Public - City
Outdoor Lighting, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 30, 2025
June 26, 2025
Multiple Locations, Winnipeg, MB
Related To This Project
Winnipeg, MB
Bid Date: May 06 2025
Winnipeg, MB
Bid Date: May 08 2025
Winnipeg, MB
Bid Date: Apr 29 2025
Winnipeg, MB
Bid Date: May 15 2025
Winnipeg, MB
Bid Date: May 02 2025
Winnipeg, MB
Bid Date: May 06 2025
Winnipeg, MB
Bid Date: May 06 2025
Winnipeg, MB
Bid Date: Aug 01 2019
Winnipeg, MB
Bid Date: May 02 2025
Winnipeg, MB
Bid Date: May 02 2025
Winnipeg, MB
Bid Date: May 02 2025
Winnipeg, MB
Bid Date: Apr 14 2025
Winnipeg, MB
Bid Date: Apr 24 2025
Winnipeg, MB
Bid Date: May 06 2025
Winnipeg, MB
Bid Date: May 02 2025
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
