BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 27, 2025 at 8:00 PM

Updated May 30, 2025

Demolition and site work for an educational facility in Fort Worth, Texas. Completed plans call for the demolition of a educational facility; and for site work for a educational facility.

Major Interior renovations throughout, A new secured front entry vestibule, Corridor upgrades, Upgrades at the Commons/Media Center/Cafeteria, and Upgrades for student collaboration. Building Additions will be provided and include but not be limited to the following: The expansion of the Dining Room, CTE Labs, Band, Orchestra, Choir, Media Center, Administration, Science Labs, General Classrooms, and Life Cycle Improvements. The scope of work will include Mechanical/Electrical/Plumbing systems, Technology, Security, Interior Finishes, and Roofing. The scope of work for the site will include but not be limited to the following: The extension of the existing fire lane, Modification of the existing track, Minor exterior and site Improvements, and the provision of a temporary classroom village. The target enrollment Capacity is 1,350 students. Scope of Work. The Work consists of: TEA #055 - MEADOWBROOK MIDDLE SCHOOL ADDTIONS/ RENOVATIONS Project consists of the following: The scope of work for the FWISD Meadowbrook Middle School will include but not be limited to the following items: Major Interior renovations throughout, A new secured front entry vestibule, Corridor upgrades, Upgrades at the Commons/Media Center/Cafeteria, and Upgrades for student collaboration. Building Additions will be provided and include but not be limited to the following: The expansion of the Dining Room, CTE Labs, Band, Orchestra, Choir, Media Center, Administration, Science Labs, General Classrooms, and Life Cycle Improvements. The scope of work will include Mechanical/Electrical/Plumbing systems, Technology, Security, Interior Finishes, and Roofing. The scope of work for the site will include but not be limited to the following: The extension of the existing fire lane, Modification of the existing track, Minor exterior and site Improvements, and the provision of a temporary classroom village. The target enrollment Capacity is 1,350 students. Bidders shall provide an anticipated construction schedule in calendar days from construction start date to the anticipated substantial completion date for the project. All questions associated with this CSP are to be proposed at the Pre-Proposal meeting or submitted through the IonWave portal no later than the questions cutoff deadline of MAY 21, 2025 at 2:00 PM. Answers will be provided weekly through the IonWave system no later than MAY 23, 2025 by 5:00PM CST.

Post-Bid

Educational

$24,861,202.00

Public - City

Demolition, Site Work

483

45

215

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
404
Active Projects
211
Bidding Soon
3,782
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 29, 2025

July 9, 2025

Project location map

2001 Ederville Rd, Fort Worth, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.