BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 13, 2025 at 8:00 PM

Updated May 14, 2025

Site work and renovation of a water / sewer project in Morrow, Georgia. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

K machine to provide 4 Millwrights trucks, tooling, equipment & supervision to complete the following: Field Removal o Disconnect Mechanical components of Drive system for removal of existing scum collector o Remove Wiper Blades & Hardware o Remove Roller Chain in sections due to weight o Attempt to break allen keys loose on Sprockets, if not then cut shaft in pieces and remove o Remove bearings from take-up system and frames in front and back o Cut welds on guide angle and remove from wall of tank o Remove existing channel steel for covering system o Clean areas free of rust for new angle Field Installation o Install new angle & weld out o Install new shafts & sprockets, mount new bearings on the outside o Space sprockets to correct width and tighten set screws o Install roller chain on both sides and connect with masterlinks o Connect new drive system and perform alignment o Motor connection must be rewired to complete installation of wiper blades o Install wiper blades where they are accessible o Run the system to where the rest of the wiper blade attachment points can be accessed & install remainder wiper blades o Cut Stainless steel channel to length, install at correct spacing & weld out Quoted price is for work performed on straight time Monday through Friday, 7am to 4pm unless otherwise noted. Work performed before or after normal operating hours including Saturday and Sunday work will require an adjustment to the original quoted price. Any delays beyond the control of K Machine including but not limited too lock out, area access, plant operations delays and additional work beyond the original scope may require an adjustment to the original quoted price. Issuance of a purchase order constitutes acceptance of these terms. Pricing: Conditions: Quoted price is for work performed on straight time Monday through Friday, 7am to 4pm unless otherwise noted. Work performed before or after normal operating hours including Saturday and Sunday work will require an adjustment to the original quoted price. Any delays beyond the control of K Machine including but not limited too lock out, area access, plant operations delays and additional work beyond the original scope may require an adjustment to the original quoted price. Issuance of a purchase order constitutes acceptance of these terms. Labor Price-$43,605 Stainless Steel Angle & Channel-$3,800 Scum Collector Assembly & Components- $34,160 Total Price: $81,565 Street Address: 4526 Ogeechee Rd, Savannah, GA 31405 Phone: 912-236-5411 Mailing Address: PO Box 7132, Savannah, GA 31418

Post-Bid

Water / Sewer

$81,565.00

Public - County

Renovation, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
302
Active Projects
172
Bidding Soon
2,348
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2025

May 26, 2025

Project location map

To Be Determined, Morrow, GA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.