Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 6, 2025 at 8:00 PM
Updated May 7, 2025
Site work and renovation of a civil project in Sagle, Idaho. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.
Schedule A - REMOVED Schedule B - Garfield Bay Road Pressure Sewer: Construction of a pressure sewer main extension along a portion of Garfield Bay Road. Schedule C - Hoffman Avenue Pressure Sewer: Construction of a pressure sewer main extension along a portion of Hoffman Avenue, with associated roadway rehabilitation. Schedule D - Reuse Irrigation Site: Construction of irrigation line extensions at the existing effluent storage lagoon on Garfield Bay Cutoff Road. Schedule E - Lift Station #1: Replacement of existing lift station pumps. Schedule F - Lift Station #2: Replacement of existing lift station electrical components. Schedule G - Lift Station #3: Replacement of existing lift station components, including pumps, electrical control, generator, and associated system components. Schedule H - Lift Station #4: Replacement of existing lift station pumps. Schedule I - Lift Station #5: Replacement of existing lift station components, including pumps, electrical control, generator, and associated system components. A Bid Guaranty of 5 percent of the Bid Amount is required. Separate Performance and Payment Bonds, each in the amount of 100 percent of the Contract Amount, will be required. Each bidder must supply all the information required by the Bid Documents and Specifications. This project is funded by the USDA and ARPA and is subject to all requirements set forth in the contract documents. All contractors, subcontractors, or specialty contractors shall be required to have a current license as a Public Works Contractor in the State of Idaho in order to submit and Bid or Proposal on this Project. All questions shall be directed, in writing, to Willie Richter at Ardurra Group, Inc., (208) 762-3644, wrichter@ardurra.com. Question Deadline 05/01/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing. Contact information and submittal procedures for such questions are as follows: A. Joanna Litalien, (541) 969-7802, jlitalien@ardurra.com The designated website will be updated periodically with addenda, lists of registered plan holders, reports, and other information relevant to submitting a Bid for the Project. All official notifications, addenda, and other Bidding Documents will be offered only through the designated website. Neither Owner nor Engineer will be responsible for Bidding Documents, including addenda, if any, obtained from sources other than the designated website.
Post-Bid
Water / Sewer
$7,058,580.00
Public - County
Renovation, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2025
June 5, 2025
Multiple Locations, Sagle, ID
Related To This Project
Sagle, ID
Bid Date: Jun 03 2025
Sagle, ID
Bid Date: May 06 2025
Sagle, ID
Bid Date: Feb 15 2024
Sagle, ID
Bid Date: May 23 2023
Sagle, ID
--
Orofino, ID
Bid Date: May 01 2025
Boise, ID
Bid Date: Apr 29 2025
Boise, ID
Bid Date: Apr 28 2025
Lewiston, ID
Bid Date: Apr 24 2025
Boise, ID
Bid Date: Apr 29 2025
Pocatello, ID
Bid Date: May 01 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
