BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 24, 2025 at 8:00 PM

Updated June 25, 2025

Site work and paving for a mixed-use development in Avon, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

**As of June 24, 2025, the project was awarded to Knife River Corporation, but the awarded amount is not available.** All Else Necessary for the Following: 2025 Queens Road Improvements in General, Work Consists of the Reclaiming and Resurfacing of the Roadway, and Re-shouldering. The Project Consists of the Following Approximate Quantities: 21,760 Sy Reclaim Bituminous Pavement 1,050 Cy Common Excavation 4,800 Tn Bituminous Pavement Mixture 220 Cy Aggregate Shouldering Along With Traffic Control and Related Appurtenances. The Estimated Construction Cost for This Project is $520,000. Direct Inquiries to Engineer's Project Manager Jeremy Mathiasen at (320) 266-5232. Bid Security in the Amount of 5 Percent of the Amount of the Bid Must Accompany Each Bid in Accordance With the Instructions to Bidders. The Owner Reserves the Right to Retain the Deposits of the 3 Lowest Bidders for a Period Not to Exceed 60 Days After the Date and Time Set for the Opening of Bids. No Bids May Be Withdrawn for a Period of 60 Days After the Date and Time Set for the Opening of Bids. The Owner Reserves the Right to Reject Any and All Bids, to Waive Irregularities and Informalities

Award

Roads / Highways

$407,096.00

Public - City

Paving, Site Work

16

14

8

6

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
228
Active Projects
95
Bidding Soon
1,392
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

June 2, 2025

Project location map

Queens Rd, Avon, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.