BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2025 at 8:00 PM

Updated June 3, 2025

Demolition, site work and new construction of a water / sewer project in Newberry, South Carolina. Completed plans call for the construction of a water / sewer project.

00020ADVERTISEMENT FOR BIDS Owner: Newberry County Water & Sewer Authority Summit Engineering Group, Inc. Project No .: 24010Separate sealed bids for the Hollands Landing Road Pump Station will be received by Owner in its office at 13903 C. R. Koon Highway, Newberry, South Carolina until 2:00 P.M. Tuesday, May 13,2025 and then at said place be publicly opened and read aloud. The work to be done consists of furnishing all materials, equipment and labor necessary to construct a replacement for an existing duplex submersible wastewater pump station and related work. Also, demolition and removal of the existing pump station once the new station is in operation. This project is being funded in in part by a grant from the SC Rural Infrastructure Authority (SCRIA). The Information for Bidders, Bid Form, Contract, Plans, Specifications, Bid Bond, Performance Bond and Payment Bond, and other contract documents may be examined at the following locations:Newberry County Water & Sewer Authority, 13903 C. R. Koon Highway, Newberry, SC 29108Engineers: Summit Engineering Group, Inc ., Spartanburg, SC. Bidders must deposit security with all bids. Security shall be in the form of a certified check or bid bond made payable to the Owner and shall be for an amount equal to not less than five percent of the amount of the bid. Provisions of the security shall be as described in the Information for Bidders. No bid will be considered unless the bidder is legally qualified under the provisions of the South Carolina Contractor's Licensing Law (South Carolina Code of Laws as amended on April 1, 1999,Chapter 11, Sections 40-11-10 through 40-11-428).Contractors shall have a classification of WL.No bidder may withdraw the bid within ninety days after the actual date of the opening and thereof.The Owner reserves the right to waive any informalities or to reject any or all bids. All bidders must order Plans and Specifications directly from Summit Engineering Group Inc. In order to bid on the project you must be added the Plan Holders list to ensure all addendums are received.

Bid Results

Water / Sewer

$1,794,515.00

Public - County

Demolition, New Construction, Site Work

18

17

4

4

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
245
Active Projects
123
Bidding Soon
1,575
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 13, 2025

July 14, 2025

Project location map

To Be Determined, Newberry, SC


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.