Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 3, 2025 at 8:00 PM
Updated June 4, 2025
Renovation of an educational facility in Summerville, South Carolina. Completed plans call for the renovation of a educational facility.
As of June 3, 2022, the project was awarded to Radco Roofing, with an awarded amount of $1,449,087.00. Berkeley County School District seeks highly qualified roofing contractors for the Sangaree Elementary School Roof Replacement project as outlined in the solicitation package. The specifications reference the replacement and repairs of the roof and associated metal work. Visit the BCSD website for full specifications. Question Deadline 04/25/2025 at 5:00 PM ET All questions must be submitted to Robin McNeal, via email, at mcnealr@bcsdschools.net prior to the deadline for questions stated herein, Brad Wiggins, RRC, REWC, RRO, CDT, WM Building Envelope Consultants, brad@wmbeconsultants.com Scope of work includes roof replacement of low slope Roof Areas A, B, C, D, E, F, G, H, I, J, K, and L down to the existing roof deck at Sangaree Elementary School for approximately 894 squares. Roof replacement includes roof deck repairs, insulation system (including taper), and a modified bitumen roof system. Associated sheet metal components and accessories are included Berkeley County School District (BCSD) is the fourth largest school district in the State of South Carolina. The District covers a geographic area of 1,229 square miles. It is one of the fastest growing counties in the state, in terms of population, and is located just north of Charleston, South Carolina. BCSD currently serves a student population of over 40,000 students ranging from pre-school to high school. The District currently operates 47 schools (24 elementary/intermediate schools, 11 middle schools, 9 high schools, 2 K-8, and 1 alternative). In addition to these schools, the District operates other specialized learning centers and has multiple administrative and support facilities located throughout Berkeley County. In addition, construction of 3 schools to be completed within 3 years. The District strives to promote a high standard of excellence to create an atmosphere of partnership with the community and to ignite in every student a passion for excellent knowledge and skills through dynamic instructions and personalized educational opportunities. Providing healthy, sanitary, and safe environments to our students and staff is critical to the District's ability to meet this goal. The health and safety of our students is an integral part of our priorities at all times. PURPOSE: The District is seeking bids from highly qualified roofing contractors for the Sangaree Elementary School Roof Replacement project as outlined within this solicitation package. The specifications reference the replacement and repairs of Sangaree Elementary School roof and associated metal work. Alternate 1 2. Remove Roof Areas A and B from the scope. Alternate 2 3. Remove Roof Areas K and L from the scope.
Award
Educational
$1,449,087.00
Public - County
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 14, 2025
June 13, 2025
1460 Royle Rd, Summerville, SC
Related To This Project
Summerville, SC
Bid Date: Apr 29 2025
Summerville, SC
Bid Date: May 07 2025
Summerville, SC
--
Summerville, SC
--
Summerville, SC
Bid Date: May 05 2025
Summerville, SC
--
Summerville, SC
--
Summerville, SC
Bid Date: May 29 2025
Summerville, SC
Bid Date: Jul 01 2025
Summerville, SC
Bid Date: Apr 22 2025
Summerville, SC
Bid Date: Apr 30 2025
Summerville, SC
Bid Date: Apr 16 2025
Summerville, SC
--
Summerville, SC
--
Summerville, SC
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
