Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 10, 2025 at 8:00 PM
Updated June 11, 2025
Site work and paving for a bridge / tunnel in Burnsville, Minnesota. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
**As of June 10, 2025, the project was awarded to Minnowa Construction Inc. but the awarded amount is not available.** Construction Plans for Bridge No. 28561 and Approach Grading Located 0.1 miles North of State Line on Oakland Drive over Waterloo Creek 5.3 miles Southeast of Spring Grove, MN Construction Location: Located 0.1 miles North of State Line on Oakland Dr over Waterloo Creek. 5.3 miles Southeast. 2401.507 Structural Concrete (3b52) (P) Cu Yd 70 2401.508 Reinforcement Bars (Epoxy Coated) (P) Pound 22840 2401.518 Bridge Slab Concrete (3yhpc-m) (P) Sq Ft 1920 2405.503 Prestressed Concrete Beams 27m (P) Lin Ft 244 2452.602/00400 Rock Socket Each 10 2511.507 Random Riprap Class Iii Cu Yd 301
Award
Bridges / Tunnels
$630,000.00
Public - County
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
