Site work for a civil project in North Bend, Nebraska. Completed plans call for site work for a water / sewer project.

Lift station and collection system improvements including installation of CIPP liners, dig and replace spot repairs, and lift station rehabilitation. Question Deadline 04/24/2025 Bidder shall submit all questions about the meaning or intent of the Bidding Documents to Engineer in writing SCOPE A. The work shall consist of the mobilization and demobilization of Contractors forces and equipment necessary for performing the work required under the contract. B. This work shall not include mobilization and demobilization for specific items of work for which payment is provided elsewhere in the contract. C. Mobilization shall not be considered as work in fulfilling the contract requirement for commencement of work. D. The work shall consist of providing all required contract bonding and insurance required under the contract. Custom bid result Total Group A Thompson Construction -$896,208 Total Group B Midlands Contracting, Inc. (Johnson Service Company) -$309,870

Award

Water / Sewer

$1,206,078.00

Public - City

Site Work

33

25

16

5

Subscribe For Documents

40 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Summary, Work Restrictions, Use of Site, Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Temporary Utilities, Construction Facilities, Sanitary Facilities, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Closeout Submittals, Bonds
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition, Selective Site Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Reinforcing Steel, Precast Concrete, Precast Structural Concrete
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing, Dampproofing, Bituminous Dampproofing
Division 09 - Finishes

Division 09 - Finishes

Tiling, Quarry Tiling, Painting and Coating
Division 12 - Furnishings

Division 12 - Furnishings

Multiple Seating, Pews and Benches, Benches
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Low-Voltage Electrical Distribution, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Exterior Lighting, Roadway Lighting
Division 27 - Communications

Division 27 - Communications

Audio-Video Communications, Audio-Video Systems
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Finish Grading, Excavation and Fill, Excavation, Dewatering, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Exterior Improvements, Operation and Maintenance of Exterior Improvements, Operation and Maintenance of Planting, Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Aggregate Surfacing, Curbs and Gutters, Planting, Turf and Grasses, Seeding
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities, Relining Sewers, Common Work Results for Utilities, Water Utilities, Water Utility Distribution Piping, Sanitary Sewerage Utilities, Wastewater Utility Pumping Stations, Packaged Utility Lift Stations
Division 34 - Transportation

Division 34 - Transportation

Transportation, Transportation Signaling and Control Equipment, Roadway Signaling and Control Equipment, Traffic Signals
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Gas and Vapor Process Piping
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Lifting Devices, Clamps, Manufacturing Equipment, Assembly and Testing Equipment, Cutting Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
48
Active Projects
25
Bidding Soon
455
All Active Projects
176
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

June 30, 2025

img_map_placeholder

To Be Determined, North Bend, NE


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.