Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published June 26, 2025 at 8:00 PM
Updated June 27, 2025
Site work for a bridge / tunnel in Peterborough, Ontario. Conceptual plans call for site work for a bridge / tunnel.
Trent University invites proponents to submit proposals for a comprehensive rehabilitation strategy to replace the Faryon Bridge Deck. The comprehensive rehabilitation strategy would, in general, include the following work: Phase 1: Bridge Deck and Balustrades -Wholesale removal and reconstruction of bridge deck slab edges, including fabrication of galvanized steel guard replacements -Wholesale removal and reconstruction of balustrades, including fabrication of galvanized steel bracket replacements -Localized repair of deteriorated bridge deck concrete -Wholesale removal and reconstruction of sloped bridge deck topping -Wholesale removal and reconstruction of bridge deck expansion joints -The installation of PMMA traffic deck waterproofing coating on the bridge deck and elastomeric coating on balustrades -Remove, refurbish, and reinstate existing candy cane light posts Phase 2: Bridge Superstructure and Post Tensioning -Localized restoration of deteriorated areas on arches, piers, and foundations -Gas drying and resin impregnation of post-tensioned girder and arch tendons -Installation of galvanic anodes (cathodic protection) in areas of high corrosion potential -The application of lithium nitrate to delay the advancement of the ASR deterioration -Apply penetrating silane sealer and elastomeric waterproofing coating to beams, arches, piers, and deck soffit to limit the ingress of future moisture. Abutment Beams & Bearing Pads -Restoration of deteriorated concrete of abutment beams -Wholesale replacement of existing abutment beam bearing pads -Modification to the hydro duct bank through the abutment beams -Application of penetrating silane sealer and elastomeric waterproofing coating to beams Question Deadline 04/25/2025 at 4:00 PM ET Online Portal TIMELINE: Project has been cancelled. Coverage of this report has been discontinued.
Project Abandoned
Bridges / Tunnels
$300,000.00
Public - State/Provincial
Site Work
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 5, 2025
June 27, 2025
1600 W Bank Dr, Peterborough, ON
Related To This Project
Peterborough, ON
Bid Date: May 08 2025
Peterborough, ON
Bid Date: May 14 2025
Peterborough, ON
Bid Date: May 20 2025
Peterborough, ON
Bid Date: May 23 2025
Peterborough, ON
Bid Date: Apr 25 2025
Peterborough, ON
Bid Date: May 16 2025
Peterborough, ON
Bid Date: May 22 2025
Peterborough, ON
Bid Date: May 14 2025
Peterborough, ON
Bid Date: May 20 2025
Peterborough, ON
Bid Date: May 29 2025
Peterborough, ON
Bid Date: Apr 22 2025
Peterborough, ON
Bid Date: Apr 17 2025
Peterborough, ON
Bid Date: Apr 15 2025
Peterborough, ON
Bid Date: May 30 2025
Peterborough, ON
Bid Date: Apr 10 2025
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
