BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2025 at 8:00 PM

Updated July 1, 2025

Site work for a sidewalk / parking lot in Long Beach, Washington. Completed plans call for site work for a sidewalk / parking lot.

The project includes improvements to the Long Beach Boardwalk, including removal and replacement of decking boards, 2x joists, stair framing, wood guardrails, galvanized steel handrails, lighting, electrical conduit, and electrical panels. The project also includes installation of added wood framing to raise the elevation of some sections of boardwalk as shown in the Plans. The Work shall be substantially complete within 240 calendar days after the commencement date stated in the Notice to Proceed. All bidding and construction is to be performed in compliance with the Contract Provisions and Contract Plans for this project and any addenda issued thereto that are on file at the office of the City Clerk, City Hall, Long Beach, Washington. All Proposals must be accompanied by a certified check, postal money order, cashiers check, or Proposal bond payable to the "City of Long Beach" and in an amount of not less than five percent (5%) of the total Proposal amount. Financing of the Project has been provided by City of Long Beach, Washington and the U.S. Department of Commerce, Economic Development Administration. The City of Long Beach expressly reserves the right to reject any or all Proposals and to waive minor irregularities or informalities in any Proposal. Contract questions shall be directed only to the office of the Project Engineer. The work specified in this Section consists of mobilization and demobilization. Mobilization consists of preconstruction activities and preparatory work for the project necessary to mobilize labor, materials, and equipment to the project site. Demobilization consists of activities to remove materials and equipment from the project site upon project completion, including final cleanup. Items which are not considered mobilization or demobilization include but are not limited to: A. On-going activities throughout the duration of construction. B. Profit, interest on borrowed money, overhead, or management costs.

Bid Results

Sidewalks / Parking Lot

$2,214,612.00

Public - City

Site Work

27

17

9

5

Subscribe For Documents

33 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
168
Active Projects
95
Bidding Soon
930
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 15, 2025

July 14, 2025

Project location map

Multiple Locations, Long Beach, WA

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.