BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 16, 2025 at 8:00 PM

Updated July 17, 2025

Renovation of a municipal facility in Carson City, Nevada. Completed plans call for the renovation of a municipal facility.

Galletti Flooring - SRC. Deadline for questions ..................................................................................... No later than 5:00 pm on 04/07/2025 Coordinate and facilitate a minimum of three (3) PFAS workgroup discussions during year one of the contract, and one meeting per year for years two and three, with NDEP PFAS stakeholders, and provide technical input, presentations and recommendations for the annual PFAS Action Plan update. Prepare meeting minutes including overview of discussions, follow up items, and path forward. Provide guided discussions for reviewing and updating the following, but not limited to, PFAS Action Plan components based upon the current state of science: PFAS Regulations Federal Regulations A. National Primary Drinking Water Standard for PFAS B. Aquatic Life Water Quality Criteria for PFAS C. CERCLA Hazardous Substances Designations for PFOS and PFOA D. Nine PFAS added to the list of RCRA hazardous constituents E. Seven PFAS added to the Toxics Release Inventory 5.2.2. State Regulations A. BWQP Freshwater Aquatic Life Water Quality Criteria B. BWPC NPDES Permitting C. BISC CERCLA D. BSMM RCRA E. BAQP/BAPC CAA 5.2.3. 5.2.4. PFAS in Nevada A. Results of NDEP PFAS Sampling B. UCMR 5 Results C. Academic Research on PFAS in Nevada Potential Location of PFAS Releases A. Fate & Transport of PFAS in Nevada B. PFAS Risk Assessment Modeling Tool` 5.2.5. Private Well Sampling 5.2.6. Source Water Protection 5.2.7. PFAS detection reporting (Spill Reporting Hotline) 5.2.8. PFAS detection response 5.2.9. Communication plan and public messaging in coordination with NDEP's Public Information Office. 5.2.10. Tools and templates for public notification Public Transparency and Website Communication 5.2.11. Targeted PFAS guidance, outreach and education to regulated entities and private well owners on best management practices to minimize exposure. 5.2.12. Treatment and Remediation A. Consolidation B. Granular Activated Carbon C. Powdered Activated Carbon D. Ion Exchange E. Anion Exchange 5.2.13. Funding A. EC-SDC B. SUDC C. USDA D. Maximizing Funding Sources and Meeting Grant Conditions 5.3. NDEP Internal Stakeholders' Meetings 5.3.1. Vendor shall have experience and staff capable of setting up, running, and documenting meetings video-conferencing, to include 5.3.2. A. efficient scheduling methods to accommodate maximum stakeholder participation; B. drafting of agendas with minimal NDEP involvement; C. guiding discussions to meet agenda timelines while ensuring appropriate stakeholder input; D. maintaining and distributing meeting minutes; and E. identifying action items and following up on progress for those items. 5.3.3. Vendors shall have experience or develop familiarity with the stakeholders who may be involved in the updating of the Nevada PFAS Action Plan. 5.3.4. Vendor shall have experience or develop familiarity with PFAS and the environmental concerns and technical issues associated with their presence in the environment in order to effectively guide detailed discussions regarding sampling, analysis, and risk assessment/communication during stakeholder meetings.

Award

Municipal

Public - State/Provincial

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
26
Bidding Soon
405
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 21, 2025

June 10, 2025

Project location map

To Be Determined, Carson City, NV


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.