BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 9, 2025 at 8:00 PM

Updated June 21, 2025

Site work for a water / sewer project in Grand Prairie, Texas. Completed plans call for site work for a water / sewer project.

2017 Cwsrf Water & Wastewater Improvement, Consisting of: Approximately 9,600 Lf of 8-inch,12-inch, 15-inch, 18-inch and 21-inch Gravity Sewer Line Replacement by Open Cut, 7,700 Lf of 12-inch, 16-inch and 18-inch Sewer by Pipe Bursting, Approximately 2,200 Lf of 8-inch and 12-inch C900 Pvc Waterline by Open Cut, and Approximately 5,100 Square Yards of Pavement Repair. All Bids Shall Propose to Perform at Least 51% of the Bid Work With the Bidder's Own Forces. Category Mbe Wbe Construction 19.44% 9.17% Equipment 16.28% 11.45% Services 20.41% 13.66% Supplies 25.34% 8.82% This contract is contingent upon release of funds from the Texas Water Development Board (TWDB) This Contract is Contingent Upon Release of Funds From the Texas Water Development Board (Twdb). Engineer's Estimate of Probable Construction Cost: $8,348,000.00, Eight Million Three Hundred Forty-eight Thousand Dollars Any Contracts in Excess of $2,000 for Construction, Alteration or Repair (Including Painting and Decorating and Funded Under the Clean Water State Revolving Fund and Drinking Water State Revolving Fund Programs Shall Include the Mandatory Davis-bacon Act Contract Conditions Equal Opportunity in Employment - All Qualified Applicants Will Receive Consideration for Employment Without Regard to Race, Color, National Origin, Sex, Religion, Age, or Handicap. The Contractor Shall Carry Out Applicable Requirements of 40 Cfr Part 33 in the Award and Administration of Contracts Awarded Under Twdb Financial Assistance Agreements. Failure by the Contractor to Carry Out These Requirements is a Material Breach, Which May Result in the Termination of the Awarded Financial Assistance. All Laborers and Mechanics Working on the Work Site and Employed by Contractors and Subcontractors on Projects Funded Directly by or Assisted in Whole or in Part by and Through the Clean Water State Revolving Fund or Drinking Water State Revolving Fund Shall by Paid Wages as Described in the Section, Mandatory Davis-bacon Act Contract Conditions. This Contract is Subject to the Environmental Protection Agency's (Epa) Fair Share Policy, Which Includes Epa-approved Fair Share Goals for Minority Business Enterprise (Mbe) and Women Business Enterprise (Wbe) Firms in the Construction, Supplies, Equipment, and Services Procurement Categories. Epa's Policy Requires That Applicants and Prime Contractors Make a Good Faith Effort to Award a Fair Share of Contracts, Subcontracts, and Procurements to Minority Business Enterprise and Women-owned Business Enterprise Firms. Although Epa's Policy Does Not Mandate That the Fair Share Goals Be Achieved, It Does Require Applicants and Prime Contractors to Demonstrate Use of the Six Affirmative Steps. The Current Fair Share Goals for the State of Texas Are as Follows:

Post-Bid

Water / Sewer

$8,348,000.00

Public - City

Site Work

106

19

2

8

Subscribe For Documents

63 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
379
Active Projects
146
Bidding Soon
3,810
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.