BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 20, 2025 at 8:00 PM

Updated June 21, 2025

Site work and paving for a sidewalk / parking lot in Plainfield, Illinois. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

As of May 15, 2025, this project has not yet been awarded. The project is expected to be awarded on June 11th Board Meeting. The Plainfield Park District is accepting bids for the following project: Normantown Trail Phase 2 Each bid must be placed in an opaque sealed envelope and clearly marked Plainfield Park District : Normantown Trail Phase 2 Bid# 2046. Bids submitted after the closing time will be rejected and returned unopened. No responsibility shall be attached to any person for the premature opening of a bid not properly identified. No oral proposals or modifications will be considered. No faxed or e-mail bid or modification of a bid will be considered. The work of this project is subject to the Illinois Prevailing Wage Act, 820 ILCS130/0.01 et seq. A prevailing wage determination has been made by the Illinois Department of Labor for public works projects in Will County. All bid proposals must be accompanied by a bid bond or bank cashier's check payable to the Plainfield Park District for ten percent (10%) ofthe amount of the bid. The Plainfield Park District reserves the right to waive all technicalities, to accept or reject any or all bids, and/orto accept only portions of a bid and reject the remainder without disclosure for any reason.Failure to make such a disclosure will not result in accrual of any right, claim or cause of action by any Bidder against the Plainfield Park District. Contractor shall commence the Work on or about June 9, 2025, 2025 or such other date as mutually agreed to by the Parties. Contractor shall achieve Substantial Completion of the Work on or before September 19, 2025 and shall achieve Final Completion of the Work on or before October 24, 2025.

Award

Sidewalks / Parking Lot

$459,222.00

Public - City

Paving, Site Work

29

14

2

3

Subscribe For Documents

11 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
445
Active Projects
243
Bidding Soon
3,367
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2025

June 9, 2025

Project location map

Normantown Rd, Plainfield, IL

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.