Published May 13, 2025 at 8:00 PM
Updated May 16, 2025
Renovation of an educational facility in Austin, Texas. Completed plans call for the renovation of a educational facility.
Installing a new Process Steam Boiler System within the existing high bay in the southern portion of EME. The process steam will serve the Pilot Plant directly south of EME and will completely replace the existing process steam boiler. Project Location: 10500 Exploration Way, Austin, TX, 78758 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The value range for this project is $1,600,000.00 to $2,100,000.00. The project schedule is to complete the project prior to December 5, 2025. Question Deadline 04/24/2025 at 12:00 PM CT All questions and inquiries regarding this RFP must be submitted via UT Drop Box to Trina A. Bickford, Assistant Director, Contracts Campus Operations The University of Texas at Austin 1301 E. Dean Keeton, Rm. 2.102* Austin, TX 78712 Telephone: 512.471.3042* Email: Trina.Bickford@austin.utexas.edu The Work is defined by the Contract Documents and generally consists of the following: 1. General: selective demolition as required to complete the new work.2. Architectural: installation of new welded wire mech partition system including swing doors and sliding gates; New egress door hardware installed in the mesh partition system; miscellaneous work as required by mechanical, plumbing, and electrical system Work. 3. Structural: Installation of new structural steel support for overhead process steam piping and miscellaneous related equipment; Modifications to existing slab for underfloor plumbing. 4. Mechanical (HVAC): None. 5. Mechanical (Plumbing): Installation of new underfloor drain lines. 6. Mechanical (Process Steam): Installation of new process steam boiler system and associated support equipment; New process steam piping from the steam boiler systems to the demarcation point to serve Owner's research distillation plant. 7. Electrical: Installation of a new electrical switchboard; New branch circuit conduit and wiring; New utility lighting fixtures; New distribution conduit for Owner's low voltage systems. 8. Fire Protection: Repositioning of existing sprinkler heads (if needed). 9. Fire Alarm: Addition of fire alarm notification appliances (if needed).
Post-Bid
Educational
$2,100,000.00
Public - State/Provincial
Renovation
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 15, 2025
June 16, 2025
10500 Exploration Way, Austin, TX
Related To This Project
Austin, TX
Bid Date: Jul 22 2025
Austin, TX
Bid Date: May 02 2025
Austin, TX
--
Austin, TX
Bid Date: Apr 30 2025
Austin, TX
--
Austin, TX
Bid Date: May 06 2025
Austin, TX
--
Austin, TX
Bid Date: May 07 2025
Austin, TX
--
Austin, TX
--
Austin, TX
Bid Date: May 05 2025
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.